CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 10 – POWERPLANT
Date of issue: 2012-05-28
Revision No.: 3
10 - 15
(d) Connect wiring according the wiring diagrams (see Wiring Manual).
(e) Install the oil cooler (see 10.3.14).
(f) Install the water cooler (see 10.3.16).
(g) Connect and secure oil system hoses.
(h) Connect and secure fuel system hoses.
(i) Install air intake of the engine (see 10.3.10).
(j) Connect control cable of the carburetors preheating flap.
(k) According to the Fig. 10-8 connect control cables of the throttle and the choke on the
carburetors control levers. Adjust throttle control (see 10.4.5) and the choke (see 10.4.6).
1 Carburetor, left
4 Choke control cable
2 Airbox
5 Throttle control lever
3 Throttle control cable
6 Choke control lever
Fig. 10-9
: Throttle and choke control connection
(l) Connect the air hose from the heat exchanger for heating the airplane cockpit.
(m) Fill the prescribed amount oil and cooling liquid quantity.
(n) Check fuel system tightness (see 9.4.1).
(o) Install the propeller (see 10.3.4 or 10.3.6 or 10.3.8).
(p) Install and connect the battery (see 11.3.3).
(q) Install engine cowlings.
(r) Perform engine test (see 10.4.1).
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...