PS-28 Cruiser
PS-28N Cruiser
CR-MM-1-0-00
CHAPTER 12 – INSTRUMENTS AND AVIONICS
Revision No.: 22
Date of issue: 2018-09-27
12 - 46
1 SV-D1000 display
5 Ethernet connector
2 DB37 display connector
6
Screw (6 pcs.)
3 SkyView network connector
For information:
4 USB connector
7
Instrument panel
Fig. 12-39
: SV-D1000 display removal / installation
12.3.32
Installation of SV-D1000 display
Type of maintenance: line
Authorization to perform:
See point 2.5.3.
Tools needed:
-
5/64” hex drive tool
-
Screwdriver
NOTE:
Installation is the same for both displays.
(a) Connect the connectors (2, 3, 4, 5, Fig. 12-39) to the display (1).
(b) Slide the display (1) to the panel (7) and fasten it by means of the screws (7).
(c) Set the
MASTER BAT
,
EFIS1 / EFIS 2
switches to ON and
do an operational test of the
system.
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...