CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 10 – POWERPLANT
Date of issue: 2020-11-19
Revision No.: 24
10 - 19
Fig. 10-13
: Engine mount removal / installation
10.3.6 Engine mount installation
Type of maintenance: heavy
Authorization to perform:
See point 2.5.3.
Tools needed:
-
wrench size 9/16”
-
screwdriver
-
torque wrench
-
cutting pliers, pliers
WARNING:
ENGINE IGNITION MUST BE SWITCHED OFF!
(a) Install the engine mount (1, Fig. 10-13) and screw self-lock nuts (2). Tighten up to a torque
of 20 Nm (177 inch lb).
(b) Install the engine and all other parts (see CR-MM-1-0-00, chapter 10.3.2, the latest revision).
(c) Mount all cables by the cable tie.
(d) Connect the battery and install upper line of spark plugs to the engine.
(e) Install the engine cowlings.
(f) Restore the aircraft to the airworthy condition.
(g) Perform engine run test (see
CR-MM-1-0-00
, the latest revision).
(h) Complete the aircraft records.
1 Engine mount
2 Nuts (4 pcs.)
1
2
2
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...