PS-28 Cruiser
PS-28N Cruiser
CR-MM-1-0-00
CHAPTER 2 – TIME LIMITS / MAINTENANCE CHECKS
Revision No.: 24
Date of issue: 2020-11-19
2 - 16
SCHEDULED SPECIAL INSPECTION-continue
Aircraft S/N: ………………….
TSN (OH): ………………….
Registration mark: ………………….
TSN (cycles): ………………….
Page: 1 of 1
Chpt.
Prescribed works
Made by
Checked by
10
Sensenich 3B0R5R68C propeller-continued
Major inspection after 2000 hrs of operation
Remove the propeller and send it to the
manufacturer/authorized service organization -
checking of propeller after 2000 hrs is done at
manufacturer or his authorized service
organization.
12
Ignition switch: inspection and lubrication
after every 2000 hours of operation
For detail work procedure, see section 12.4.10.
Notes:
Date: ………………….
Signature: ………………….
2B.4.7 Scheduled Inspection after 25 FH or 50 cycles
SCHEDULED INSPECTION AFTER
25 FH or 50 cycles (whichever comes first)
Aircraft S/N: ………………….
TSN (OH): ………………….
Registration mark: ………………….
TSN (cycles): ………………….
Page: 1 of 1
Chpt.
Prescribed works
Made by
Checked by
8
Landing gear
Nose Landing Gear
Check of the landing gear leg for cracks (valid
only for non - reinforced NLG No.SG0270N)
(see 8.4.3).
Notes:
Date: ………………….
Signature: ………………….
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...