CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 12 – INSTRUMENTS AND AVIONICS
Date of issue: 2018-09-27
Revision No.: 22
12 - 27
Fig. 12-26
: Lift detector removal / installation
12.3.7 Removal of the flight instruments
Type of maintenance: line
Authorization to perform:
See point 2.5.3.
Tools needed:
-
Phillips PH1 screwdriver
-
pliers, cutting pliers
(a) Remove bolts securing the left instrument panel and carefully pull out and hold the
instrument panel.
(b) Remove the cable ties (9, Fig. 12-27) from the hoses (7, 8).
(c) Disconnect the hoses (7, 8) of static and total pressure from the rear ports on the
appropriate indicator (1, 2).
(d) Disconnect the wires (10) from the illuminator (3).
(e) Unscrew the nuts (5), remove the washers (6) and bolts (4).
(f) Remove the instrument (1, 2) and illuminator (3) from the panel.
(g) Install the protective cover on the rear ports of the instrument.
1 Lift detector
2 Wire
3 Screw
4 Screw (4 pcs.)
5. Leading edge
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...