CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 2 – TIME LIMITS / MAINTENANCE CHECKS
Date of issue: 2020-11-19
Revision No.: 24
2 - 19
Unit
Area of lubrication
After first
25 FH
Every
100 FH
Every
500 FH
Lubricant
HTU
Elevator hinges.
X
X
X
AeroShell
Grease 22
Rod end bearing of the elevator
control tubes.
-
-
X
AeroShell
Grease 22
Pins (front stabilizer hinge).
-
Annual
insp.
-
LPS3
VTU
Rudder hinges.
X
X
X
AeroShell
Grease 22
Cable shackles on the rudder
control cables.
X
X
X
AeroShell
Grease 22
Trim and
balance
tabs
Tabs hinges.
X
X
X
LPS1
Rod end on actuators.
X
X
X
AeroShell
Grease 22
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...