CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 8 – LANDING GEAR
Date of issue: 2013-10-09
Revision No.: 7
8 - 25
NOTE:
The lining requires replacement when the wear indicator is no longer visible.
Fig. 8-18
: Change of brake lining
8.5.4 Lubrication of axis of rotation of nose landing gear
Type of maintenance: line
Authorization to perform:
-
Sport pilot or higher
Tools needed:
-
wrench size 1/2 in
-
grease gun
(a) Unscrew and remove the bolt (8, Fig. 8-14) with the washer (9) and remove cover (7).
(b) By means of the grease gun lubricate axis of rotation.
CAUTION:
AVOID TO GREASE CONTAMINATES THE FRICTION AREAS!
(c) Apply Loctite 221 on the bolt (8) with the washer (9) and install the cover (7).
1 Bolt
2 Movable brake shoe
3 Stationary brake shoe
4 Lining
5 River
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...