![cytiva Sterile Tube Fuser Скачать руководство пользователя страница 79](http://html1.mh-extra.com/html/cytiva/sterile-tube-fuser/sterile-tube-fuser_operating-instructions-manual_2706957079.webp)
Step
Action
5
Verify that the tube restrictors have been removed and that nothing
obstructs the jaws.
Press
GO to continue calibration.
Result:
The display shows
CALIBRATING… and the jaws start closing. Make sure no
objects restrict the jaws from closing completely.
Note:
If the
GO button is pressed during calibration, the calibration stops and the
LCD shows
CALIBRATION ABORTED. The operator has to restart the instru-
ment and perform the steps from beginning to calibrate again.
The jaws will close to approximately 5 mm apart and then start moving
together slowly. The LCD shows the incremented position count informa-
tion.
When the jaws touch, the zero calibration is complete, and the jaws will auto-
matically retract to do a repeatability check.
If...
then...
the repeatability
test is successful
the operation proceeds to
CAL GAUGE TEST.
the repeatability
test fails
the operation is terminated and the LCD display
shows
CALIBRATION FAIL. Contact Service for
more information.
6 Maintenance
6.4 Maintenance of Hot Lips Tube Sealer
6.4.2 Functional validation and calibration
Sterile Tube Fuser - Dry and Hot Lips Tube Sealer Operating Instructions 28964139 AG
79