Safety
3-3
Section 6.3 Helium compressor installation
CAUTION
Failure to follow these installation guidelines could result in voiding the warranty.
Section 6.3.1 Prepare the compressor package location
WARNING
The compressor package must be positioned to provide easy access to the front-
panel mounted circuit breaker.
Section 6.3.2 Connect the water lines to the helium compressor (water cooled
models only)
CAUTION
Cooling water must meet the requirements in Section 5.
If water that does not meet
the cooling water specifications in Section 5 is introduced into the system, even for
cleaning purposes, it will void the warranty.
CAUTION
Do not apply heat to the cooling water inlet and outlet connectors located on the front
panel of the compressor.
Section 6.3.3 Connect the helium compressor package to the main power
CAUTION
A voltage deviation of more than 10% above or below the voltage rating can cause
compressor motor overheating and possible failure.
Indications of operation outside
that voltage range will void the compressor warranty
.
WARNING
Be sure to follow all local electrical codes and guidelines.
WARNING
One lead of the helium compressor package is grounded. Never bypass this ground
or attach the helium compressor package to an ungrounded circuit. A dangerous
electrical hazard will develop.
Содержание LNP-40
Страница 1: ...Model LNP 40 Liquid Nitrogen Plant INSTALLATION OPERATION and ROUTINE MAINTENANCE MANUAL...
Страница 4: ...1 1 N Section 1 Overview...
Страница 10: ...2 1 N Section 2 Warranty...
Страница 13: ...3 2 N Section 3 Safety...
Страница 25: ...4 1 N Section 4 Inspection and Unpacking...
Страница 29: ...5 3 N Section 5 Specifications...
Страница 50: ...6 1 N Section 6 Installation...
Страница 67: ...7 2 N Section 7 Operation...
Страница 87: ...8 1 N Section 8 Routine Maintenance...
Страница 98: ...Appendix Spray Lubricant Instructions...