Routine Maintenance
8-6
Figure 8-4: Close up of vacuum/charging manifold and pump
7) Evacuate to 50 microns.
8) Isolate the vacuum pump and add 50 PSIG (3.4 bar) of helium.
9) Vent the helium and repeat steps 7 & 8 at least once. Vent the helium and continue
to step 10.
10) Final evacuation should be to 25 microns.
11) Pressurize the line to the service access with the desired amount of helium pressure.
12) Slowly open the service valve to add helium to the system. The final helium charge in
the system is specified in Section 5.
CAUTION
No more than 5 PSIG (.34 bar) of gas should be added per minute to prevent internal
oil contamination to the system. If such contamination occurs, factory service will be
required.
13) After adding the helium, close the service valve and remove the service Aeroquip
®
from the service access.
Service
Aeroquips
Line
to
Helium
Tank
Vacuum
Sending
Unit
Vacuum Valve
Charging
Lines
Vent
Valve
Relief
Valve
11Jan10
Содержание LNP-40
Страница 1: ...Model LNP 40 Liquid Nitrogen Plant INSTALLATION OPERATION and ROUTINE MAINTENANCE MANUAL...
Страница 4: ...1 1 N Section 1 Overview...
Страница 10: ...2 1 N Section 2 Warranty...
Страница 13: ...3 2 N Section 3 Safety...
Страница 25: ...4 1 N Section 4 Inspection and Unpacking...
Страница 29: ...5 3 N Section 5 Specifications...
Страница 50: ...6 1 N Section 6 Installation...
Страница 67: ...7 2 N Section 7 Operation...
Страница 87: ...8 1 N Section 8 Routine Maintenance...
Страница 98: ...Appendix Spray Lubricant Instructions...