Specifications
5-18
Dewpoint Indicator
The dewpoint indicator provides a visual indicator of the compressed air’s dew point.
Condensate Drain Line
The condensate drain line is a plastic tube that carries away the moisture removed from
the compressed air.
Inlet Air Port
The inlet air port is a 3/8” compression fitting that is used to connect to the outlet port of
the air compressor. The connection is made with the copper tubing supplied with the air
compressor.
Outlet Air Port
The outlet air port is a 3/8” compression fitting that is used to connect to the inlet port of
the N
2
generator/filter bank panel. The connection is made with the copper tubing
supplied with the dryer.
Power Cord
The power cord supplies electrical power from the wall to the dryer.
Содержание LNP-40
Страница 1: ...Model LNP 40 Liquid Nitrogen Plant INSTALLATION OPERATION and ROUTINE MAINTENANCE MANUAL...
Страница 4: ...1 1 N Section 1 Overview...
Страница 10: ...2 1 N Section 2 Warranty...
Страница 13: ...3 2 N Section 3 Safety...
Страница 25: ...4 1 N Section 4 Inspection and Unpacking...
Страница 29: ...5 3 N Section 5 Specifications...
Страница 50: ...6 1 N Section 6 Installation...
Страница 67: ...7 2 N Section 7 Operation...
Страница 87: ...8 1 N Section 8 Routine Maintenance...
Страница 98: ...Appendix Spray Lubricant Instructions...