24
Length
(Feet)
0.3 Inch w.c. Pressure Drop
0.5 Inch w.c. Pressure Drop
½
¾
1
1¼
½
¾
1
1¼
10
132
278
520
1,050
175
360
680
1,400
20
92
190
350
730
120
250
465
950
30
73
152
285
590
97
200
375
770
40
63
130
245
500
82
170
320
660
50
56
115
215
440
73
151
285
580
60
50
105
195
400
66
138
260
530
70
46
96
180
370
61
125
240
490
80
43
90
170
350
57
118
220
460
90
40
84
160
320
53
110
205
430
100
38
79
150
305
50
103
195
400
Table 6: Maximum Capacity of Schedule 40 Pipe in CFH for Gas Pressures of 0.5 psig or Less
Table 7: Equivalent Lengths of Standard Pipe Fittings & Valves
Pipe
Size
I.D.
(Inches)
Valves (Fully Open)
Threaded Fittings
Gate
Globe
Angle
Swing
Check
90°
Elbow
45°
Elbow
90° Tee, Flow
Through Run
90° Tee, Flow
Through Branch
½”
0.622
0.35
18.6
9.3
4.3
1.6
0.78
1.0
3.1
¾”
0.824
0.44
23.1
11.5
5.3
2.1
0.97
1.4
4.1
1”
1.049
0.56
29.4
14.7
6.8
2.6
1.23
1.8
5.3
1¼”
1.380
0.74
38.6
19.3
8.9
3.5
1.6
2.3
6.9
Specific
Gravity
Correction
Factor
Specific
Gravity
Correction
Factor
0.50
1.10
1.30
1.07
0.55
1.04
1.40
1.04
0.60
1.00
1.50
1.00
0.65
0.96
1.60
0.97
0.70
0.93
1.70
0.94
0.75
0.90
---
---
0.80
0.87
---
---
Table 8: Specific Gravity Correction Factors
WARNING
Do not use matches, candles, open flames, or
other ignition source.
Figure 22: Recommended Gas Piping
C.
Pressure Test.
The boiler and its gas connection must
be leak tested before placing boiler in operation.
1. Protect boiler gas valve. For all testing over ½ psig,
boiler and its individual shut-off valve must be
disconnected from gas supply piping. For testing at
½ psig or less, isolate boiler from gas supply piping
by closing boiler’s individual manual shut-off valve.
2. Locate leaks using approved combustible gas
detector, soap and water, or similar nonflammable
solution.
Содержание 16H-340
Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation ...
Страница 13: ...13 Figure 8 Jacket Assembly ...
Страница 14: ...14 Figure 9 EP CSD 1 Control Installation ...
Страница 16: ...16 Figure 11 Main Gas Piping Intermittent Ignition EI ...
Страница 17: ...17 Figure 12 Schematic Pilot Piping Honeywell EI USA ...
Страница 18: ...18 Figure 15 Schematic Gas Piping EP CSD 1 Control System 16H 410 16H 505 ...
Страница 31: ...31 Figure 31 Wiring Diagram Honeywell EI USA Intermittent Circulation 16H 340 16H 510 MegaStor Relay MegaStor ...
Страница 37: ...37 Figure 41 Operating Instructions EI ...
Страница 47: ...47 Honeywell EI Trouble Shooting Guide ...
Страница 48: ...48 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 58: ...58 ...
Страница 60: ...60 ...