20
D.
Install Drain Valve
in rear of Left End Section,
Tapping “G”. See Figure 17. Components are located
in Water Trim Carton.
E.
Install Temperature-Pressure Gauge.
Components
are located in Water Trim Carton.
1. Standard Temperature - Pressure Gauge Piping. See
Figure 18.
Figure 17: Drain Piping Installation
Figure 20: Recommended Piping for Combination
Heating & Cooling (Refrigeration) System
a. Install 2” NPT x 10” lg. nipple with gauge
tapping into Supply Tapping “A”. See Figure 3.
Gauge tapping should face forward.
b. Insert Temperature-Pressure Gauge. Tighten
by applying pressure to square shank on back
of gauge. DO NOT APPLY PRESSURE ON
GAUGE CASE since this may ruin gauge
calibration.
2. Alternate Temperature-Pressure Gauge Piping. See
Figure 19.
a. Install 2 NPT x 10” Nipple into Supply Tapping
“A”. See Figure 3.
Figure 18: Temperature-Pressure Gauge
Installation
Figure 19: Alternate Temperature-Pressure Gauge
Installation
b. Install 2 NPT x ¾ NPT x 2 NPT Tee (provided)
or 2 NPT x 2 NPT x ¾ NPT Tee (installer
furnished). ¾ NPT leg should face forward.
c. Install ¾ NPT x ¼ NPT Bushing.
d. Insert Temperature-Pressure Gauge. Tighten
by applying pressure to square shank on back
of gauge. DO NOT APPLY PRESSURE ON
GAUGE CASE since this may ruin gauge
calibration.
F.
Connect system supply and return piping
to boiler.
See Figure 21. Also, consult I=B=R Installation
and Piping Guide No. 250. Maintain minimum ½
inch clearance from hot water piping to combustible
materials.
1. If boiler is used in connection with refrigeration
systems, boiler must be installed with chilled
medium piped in parallel with heating boiler using
appropriate valves to prevent chilled medium from
Содержание 16H-340
Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation ...
Страница 13: ...13 Figure 8 Jacket Assembly ...
Страница 14: ...14 Figure 9 EP CSD 1 Control Installation ...
Страница 16: ...16 Figure 11 Main Gas Piping Intermittent Ignition EI ...
Страница 17: ...17 Figure 12 Schematic Pilot Piping Honeywell EI USA ...
Страница 18: ...18 Figure 15 Schematic Gas Piping EP CSD 1 Control System 16H 410 16H 505 ...
Страница 31: ...31 Figure 31 Wiring Diagram Honeywell EI USA Intermittent Circulation 16H 340 16H 510 MegaStor Relay MegaStor ...
Страница 37: ...37 Figure 41 Operating Instructions EI ...
Страница 47: ...47 Honeywell EI Trouble Shooting Guide ...
Страница 48: ...48 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 58: ...58 ...
Страница 60: ...60 ...