![Cray ClusterStor L300 Скачать руководство пользователя страница 96](http://html1.mh-extra.com/html/cray/clusterstor-l300/clusterstor-l300_installation-manual_2680121096.webp)
a. Log in to the MGS node via SSH:
[MGMT0]#
ssh MGS_node
b. Use the
crm_mon
utility to monitor the status of the MGS and MDS nodes and check that their resources
have stopped:
[MGS]#
crm_mon -rl | grep fsys
Example
crm_mon
output shows the MGS and MDS nodes in a partially stopped state.
[MGS]#
crm_mon -rl
sn11000n003_md66-fsys (ocf::heartbeat:XYMNTR): Stopped
sn11000n003_md65-fsys (ocf::heartbeat:XYMNTR): Started
c. If the node is not stopped, issue the
stop_xyraid
command:
[MGS]#
stop_xyraid nodename_md65-group
Sample
crm_mon
output shows the MGS and MDS nodes in a stopped state:
[MGS]#
crm_mon -1r
sn11000n003_md66-fsys (ocf::heartbeat:XYMNTR): Stopped
sn11000n003_md65-fsys (ocf::heartbeat:XYMNTR): Stopped
6. Power off the diskless nodes:
[MGMT0]#
pdsh –f 100 –g diskless poweroff
7. Check the power off status of the diskless nodes:
[MGMT0]#
pm –q
Repeat this step until all non-MGMT nodes have been powered down.
8. From the primary MGMT node, power off the MGMT nodes:
[MGMT0]#
pdsh –g mgmt poweroff
9. After all of the nodes are shut down, physically turn off the power switches (at the back of the rack) to power
off the enclosures.
●
The power switches for the 2U24s are on the power control modules (PCMs).
●
The power switches for the SSUs and ESUs are on the power supply units (PSUs).
16.2 Power Off the ClusterStor L300 and L300N System via CSSM
Prerequisites
Stop Lustre before performing this procedure.
About this task
The CSM power off procedure stops Lustre on selected ClusterStor L300 and L300N nodes.
Reference
96
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...