![Cray ClusterStor L300 Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/cray/clusterstor-l300/clusterstor-l300_installation-manual_2680121055.webp)
Figure 45. Cable Base Rack with 32-Port 100G LDN and 48-Port LMN Using Core Switch
X5 X6
X7 X8
X1 X2
X3 X4
13 14 15 16 17 18 19 20 21 22 23 24
1 2
3 4
5 6
7 8
9 10 11 12
13 14 15 16 17 18 19 20 21 22 23 24
1 2
3 4
5 6
7 8
9 10 11 12
X5 X6
X7 X8
X1 X2
X3 X4
13 14 15 16 17 18 19 20 21 22 23 24
1 2
3 4
5 6
7 8
9 10 11 12
13 14 15 16 17 18 19 20 21 22 23 24
1 2
3 4
5 6
7 8
9 10 11 12
SW1
SW0
LMN to storage
racks 1, 2, 3 ... N
SW1 switch
LMN to storage
racks 1, 2, 3 ... N
SW0 switch
LDN to
customer
core switch
100G1
100G0
Figure 46. Cable SMU to External Administration Network
A
B
To external
administration
network (EAN)
EAC A Node n000
EAC B Node n001
pub0 interfaces (NIC 5)
SMU
Procedure
1. In the base rack and each storage rack, connect a QSFP+ passive copper data cable to the lower 100GbE
switch (100G0 in the diagram) (available ports listed above), and then to the customer core switch.
2. In the base rack and each storage rack, connect a QSFP+ passive copper data cable to the lower 100GbE
switch (100G1 in the diagrams) (available ports listed above), and then to the customer core switch.
3. In each storage rack of a multi-rack system, connect a Cat 5/6 Ethernet cable to the lower Ethernet switch
(SW0) (available ports listed above). Connect the other end of the cable to the lower Ethernet switch (SW0) in
the base rack.
4. In each storage rack of a multi-rack system, connect a Cat 5/6 Ethernet cable to the upper Ethernet switch
(SW1) (available ports listed above). Connect the other end of the cable to the upper Ethernet switch (SW1)
in the base rack.
5. In the base rack, connect a Cat 5/6 Ethernet cable from the NIC card, SMU node 0, NIC 5 to the local
network.
6. In the base rack, connect another Cat 5/6 Ethernet cable from the NIC card, SMU node 1, NIC 5 to the local
network.
Environment Connections
55
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...