![Cray ClusterStor L300 Скачать руководство пользователя страница 144](http://html1.mh-extra.com/html/cray/clusterstor-l300/clusterstor-l300_installation-manual_2680121144.webp)
16.5.22 Base Rack Optional AMMU Inverted Power Distribution for PX2-5104X2-V2
Figure 105. Base Rack Optional AMMU Inverted Power Distribution for PX2-5104X2-V2 ClusterStor L300 and L300N
16.5.23 Base Rack Optional AMMU Inverted Power Distribution for PX2-5100X2-V2
Figure 106. Base Rack Optional AMMU Inverted Power Distribution for PX2-5100X2-V2 ClusterStor L300 and L300N
Reference
144
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...