10 Cable Inter-rack Local Management Network (LMN)
Inter-rack cabling in a multi-rack ClusterStor L300 and L300N system applies to only the Local Management
Network LMN). Management switches in the base rack are connected to the management switches in each
storage rack.
The figure shows cabling for a system with a base rack and 3 storage racks. The figure also shows the inter-
switch link between the management switches in each rack.
The following ports are recommended for these connections:
24-port management switches
●
Base and storage racks:
○
Port 17 is reserved for connection between the base rack and 1 storage rack.
○
Ports 5, 7, and 19 are also available.
○
Port 13 is the ISL and is not available.
●
When a 24-port switch is used in the base rack, the system may consist of from 1 to 5 racks total.
48-port management switch
●
Base rack:
○
Ports 13, 16 through 24, 29, 31, 41, and 43 are reserved for connections to storage racks 1 through 14.
○
Ports 1 through 12, 14, and 15 are also available.
○
Port 37 is the ISL and is not available.
●
When a 48-port switch is used in the base rack, the system may consist of from 1 to 29 racks total.
Only 3 ClusterStor L300 and L300N storage racks are shown.
Cable Inter-rack Local Management Network (LMN)
36
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...