![Cray ClusterStor L300 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/cray/clusterstor-l300/clusterstor-l300_installation-manual_2680121015.webp)
4
Uncrate the ClusterStor L300 and L300N Rack
Prerequisites
See
Prerequisites to Installation
on page 9 and make sure flooring can support the shipping configuration of the
rack at 1720 lbs (780 kg), can enable the cabinet to roll, and will not be damaged.
About this task
This task describes how to safely remove the ClusterStor L300 and L300N rack from the shipping crate. Two
people are required to safely roll the rack off the pallet ramp.
Figure 4. Uncrate the Rack
Uncrate the ClusterStor L300 and L300N Rack
15
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...