![Cray ClusterStor L300 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/cray/clusterstor-l300/clusterstor-l300_installation-manual_2680121005.webp)
1
About the ClusterStor L300 and L300N Field
Installation Guide
The ClusterStor
™
L300 and L300N Field Installation Guide H-6163 includes instructions for setting up,
configuring, and testing a ClusterStor L300 or L300N storage system.
Release 3.0.0 Information
This version includes procedures to support Cray software release 3.0.0.
Table 1. Record of Revision
Publication Title
Date
Updates
ClusterStor L300 and L300N Field Installation Guide
(3.0.0) H-6163
January 2018
Initial release of 3.0.0
version.
Related Publications
Additional documentation for ClusterStor L300 and L300N systems is available from
pubs.cray.com
.
●
ClusterStor L300/L300N Cabling Guide
●
Lustre® Client Software Build and Installation Guide for Cray® Cluster Connect™ S-2550
●
XC™ Series Lustre® Administration Guide S-2648
Scope and Audience
This publication is written for trained Cray technicians and provides instructions to unpack and install a
ClusterStor L300 and L300N system at the customer site. It does not include information about daily operation.
Typographic Conventions
Monospace
Indicates program code, reserved words, library functions, command-line prompts,
screen output, file/path names, and other software constructs.
Monospaced Bold
Indicates commands that must be entered on a command line or in response to an
interactive prompt.
Oblique
or
Italics
Indicates user-supplied values in commands or syntax definitions.
Proportional Bold
Indicates a GUI Window, GUI element, cascading menu (Ctrl→Alt→Delete), or
key strokes (press Enter).
\
(backslash)
At the end of a command line, indicates the Linux
®
shell line continuation character
(lines joined by a backslash are parsed as a single line).
About the ClusterStor L300 and L300N Field Installation Guide
5
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...