5
Move the Rack to its Final Position
Prerequisites
Procedures
The ClusterStor L300 and L300N rack has been unpacked, rolled down the ramp, and the
lower two SSUs are populated with disk drives.
Tools
Bubble level
Pozidriv (or Philips) screwdriver and the two bolts provided to secure the outrigger bracket
Personnel
Two TRAINED personnel are required to complete this task.
Aluminum Plates
Aluminum plates may be required to roll the system across uneven flooring, thresholds,
carpeting, or other obstacles. Angle the cabinet when rolling it over the edge of the
aluminum plate so that only 1 wheel makes contact with the plate.
About this task
WARNING:
●
Personal Injury or Equipment Damage
●
If the rack is fully populated with SSUs and equipment, install disk drives in the lower SSUs to lower
the center of gravity and reduce the tipping hazard.
Procedure
1. Install the disk drives in the lower one or two SSUs before moving the rack to its final position to reduce the
rack tipping hazard. See
Install Disk Drives in a 5U84 Enclosure
on page 19.
2. Move the rack as close as possible to its final location.
WARNING:
●
Personal Injury or Equipment Damage
●
Do not push the rack from the side. Always push the rack from the front or rear.
Move the Rack to its Final Position
17
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...