Figure 2. Rack Service Area Clearance
3.2
Plan for Rack Position
When unpacking and assembling a multi-rack ClusterStor L300 and L300N system, carefully plan the order to
unpack and assemble the racks.
The base rack (either as a stand-alone shipment or part of a system) is identified with “R1” & “BASE,”.
Storage racks installed in manufacturing test alongside the base rack are numbered sequentially "R2" to "R
n
"
where
n
is the highest number that was physically installed with the base rack at the factory, as shown.
Storage racks that were not installed or tested with the base rack are numbered sequentially, following the last
base rack install number. SSUs are also labeled accordingly for each rack.
Prerequisites to Installation
11
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...