![Cray ClusterStor L300 Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/cray/clusterstor-l300/clusterstor-l300_installation-manual_2680121076.webp)
slot: 13, wwn: 5000cca01b4abbc8, cap: 2000398934016, dev:
sdea, parts: 0, status: Foreign Arrays, dev1: sdau, t10:
11100111120
slot: 14, wwn: 5000cca01c4c0284, cap: 2000398934016, dev:
sdfl, parts: 0, status: Foreign Arrays, dev1: sdcf, t10:
11100111120
slot: 15, wwn: 5000cca01c4b9984, cap: 2000398934016, dev:
sdfj, parts: 0, status: Foreign Arrays, dev1: sdcd, t10:
11100111120
slot: 16, wwn: 5000cca01c4c34f4, cap:
2000398934016, dev: sdfk, parts: 0, status: Failed,
dev1: sdce, t10: 11100111120
slot: 17, wwn: 5000cca01b4ce748, cap: 2000398934016, dev:
sdfm, parts: 0, status: Foreign Arrays, dev1: sdcg, t10:
11100111120
T10_key_begin:
GRD_CHK(1), APP_CHK(1), REF_CHK(1), ATO(1), RWWP(1), SPT(1),
P_TYPE(1), PROT_EN(1), DPICZ(1), FMT(1), READ_CHK(1)
T10_key_end
End_of_report
13.5 Monitor Progress Screen
Prerequisites
Lustre validation tests are complete and the results display on the Review Progress screen. If the tests do not run,
the test will not return I/O rate information. In this case, see
Post-Install Checkout
on page 86 for advanced
procedures.
About this task
When the ClusterStor L300 and L300N
Figure 57. CSM Progress Screen
Perform the First-Run Configuration
76
Содержание ClusterStor L300
Страница 1: ...ClusterStor L300 and L300N Field Installation Guide 3 0 0 H 6163...
Страница 33: ...Figure 18 Trip the Circuit Breaker Cable the External Power Connections 33...
Страница 90: ...MGMT0 cscli unmount f testfs Perform the First Run Configuration 90...
Страница 125: ...Figure 85 Base Rack Inverted Power Distribution for PX2 5965X3 V2 ClusterStor L300 and L300N Reference 125...