7
Figure 2d:
ALLY UPS in position in the ALLY UPS rail clamp (to the left of the stirrup clamp)
ALLY UPS Rail Clamp
Stirrup Rail Clamp
Stirrup
ALLY UPS Main Unit
5.
Attach the power cord to the main unit (making sure it is firmly in place) and attach it to the nearest outlet.
If an extension cord is needed, make sure it is a medical grade cord suitable to withstand 125VAC/10 amps.
NOTE:
Position foot pedal within reach of operating room personnel actuating the ALLY UPS.
It is recommended to position the ALLY UPS foot pedal separately from other foot pedals.
6.
Turn the power on and verify that the green light indicator is lit. Press and hold the foot pedal once. Release
to initialize the ALLY UPS. The ALLY UPS arm can be moved by grasping the flexible arm and depressing
the foot pedal. Releasing the foot pedal locks the ALLY UPS in place, holding the arm in a static position.
7.
Position the ALLY UPS flexible arm out of the way prior to patient preparation. It is recommended to place a
chuck over the arm while prepping the patient.
WARNING:
• Use only the rail clamp supplied with the ALLY UPS.
• Do not install rail clamp across different rail sections.
!
CAUTION:
Always ensure that the ALLY UPS is tightly and securely attached to the table prior to
the start of the surgical procedure. Improper or loose mounting of the system can lead to unintended
movement and may lead to injury.
!
CAUTION:
Users should securely hold the manipulator handle before the foot pedal is depressed
to avoid inadvertent movement of the arm.
!
ALLY Uterine Positioning System
®
(ENGLISH)