3.3.2 Step 1 - Position the Evaporative Module
Installation should only take place after careful consideration of final position of the Evaporative module and
management system and should be in accordance with AHU/duct-work installation diagram below.
Always discuss the position of the
HE2
module with your Condair representative!
The following points must be considered
1. The AHU / duct-work floor must be designed with a loading capacity capable of supporting the humidifier’s
weight when wet, as the largest unit will weigh 461kg (1016 lb) when in operation - see back of this man-
ual for weights and measures.
Caution: The
HE2
system must be installed within a waterproof AHU section
2. A drain pan with provision for running water to waste should be installed within the humidification section
to allow for wetting that might occur during installation, commissioning,operation or servicing. Where drain
pans are required to drain under gravity, ensure that the drains are trapped and primed and have enough
head to overcome the pressure of the system and for hygiene reasons completely drain down. On com-
missioning the system, drainage of the humidification section should be tested. The drain pan MUST drain
fully and should be accessible for cleaning and disinfection as part of routine maintenance of the system.
3. The Module must be positioned on a minimum height 50 mm (2”) up-stand or runners to allow for drain
pipe-work installation and removal of the tank and cassettes through the side of the AHU if required.
4. Provisions should be made for the water inlet, drain pipe-work and interconnecting electrical cable to exit
through the side of the AHU.
5. Side access through a door (preferably such that the cassettes may be pulled through for maintenance)
should always be provided and a minimum of 600mm (24”) access front and rear of system for inspection,
commissioning and maintenance.
6. A perforated plate (60/40) should be installed upstream in cases where the air flow is uneven.
Always discuss the layout with your
Condair representative
Very important: Use a spirit level to make sure that the unit is level front to back and across
the width when installed. Failure to observe this point could result in flooding of the AHU /
duct.
50mm (2”)
Upstand
Air Flow
600mm (24”)
Minimum
Access
600mm (24”)
Minimum
Access