5.5.7 Dual Operation
Dual operation - MRS
Dual operation MRS consists 2 gen-sets. Principle of dual operation is in switching the gen-sets in supplying of
load when
is activated on Master controller (on slave controller this LBI has
no function in Dual Operation). Each controller measures its gen-set. Interlock between all breakers (GCB1 and
GCB2) is required. If there is fail of one gen-set, second gen-set will take the load.
IMPORTANT: Dual operation works only in AUTO mode.
IMPORTANT: Dual operation is in fail also during process of adjustment of setpoints.
IMPORTANT: It is not possible to use Auto Run option in Exercise timers with dual operation.
Event
Dual MRS
LBI
Evaluated by Master only
Start/stop events
Communication
Communication is establish on RS232 or RS485 communication line. Plug-in module CM-RS232-485 is
required. Communication line is selected via setpoints
or
.
There are options DualMaster and DualSlave. These options adjust, which communication line is selected and
which role controller has in Dual Operation.
IMPORTANT: For correct communication it is necessary to have one Master and one Slave
controller on the same communication line.
IMPORTANT: There are no shared setpoints. It is necessary to have the same settings of engine
timers in both controllers.
In case of communication fail between controllers, alarm
Dual Operation Fail (page 665)
is activated. This
alarm is activated on both controllers. Both controllers are switched to normal operation.
COM Mode in
controller 1
COM Mode in
controller 2
Behavior
Master
Slave
OK - normal dual operation function
Slave
Master
OK - normal dual operation function
Master
Master
There will be communication fail (it is necessary to have master and
slave to establish communication line) - there will be active
Dual Operation Fail (page 665)
. This alarm will be active on
both controllers. Both controllers will be switched to normal operation.
Slave
Slave
There will be communication fail (it is necessary to have master and
slave to establish communication line) - there will be active
Dual Operation Fail (page 665)
. This alarm will be active on
both controllers. Both controllers will be switched to normal operation.
Disabled
Master/Slave
There will be communication fail (it is necessary to have master and
Adjustment of COM Modes
Содержание InteliLite AMF25
Страница 34: ...InteliLite Global Guide 34 ConnectionType SplPhL1L2 Image 4 11 Split phase L1L2 application ...
Страница 36: ...InteliLite Global Guide 36 Image 4 14 Typical Split Phase generator wiring ...
Страница 91: ...InteliLite Global Guide 91 Image 5 13 Flowchart of start of diesel engine ...
Страница 93: ...InteliLite Global Guide 93 Image 5 14 Flowchart of start of gas engine ...
Страница 199: ...InteliLite Global Guide 199 nominal speed Image 8 3 Idle Time 1 Image 8 4 Idle Time 2 6 back to List of setpoints ...
Страница 638: ...InteliLite Global Guide 638 Image 9 1 Configuration of OR AND block 6 back to List of PLC blocks ...
Страница 708: ...InteliLite Global Guide 708 Image 9 30 Inteli AIN8 Image 9 31 Inteli AIN8 dimensions Note All dimensions are in mm ...
Страница 714: ...InteliLite Global Guide 714 Image 9 32 Inteli IO8 8 Image 9 33 Inteli IO8 8 dimensions Note All dimensions are in mm ...
Страница 721: ...InteliLite Global Guide 721 Image 9 34 IGS PTM Image 9 35 IGS PTM dimensions ...
Страница 727: ...InteliLite Global Guide 727 Image 9 36 Inteli AIN8TC Image 9 37 Inteli AIN8TC dimensions ...
Страница 731: ...InteliLite Global Guide 731 Image 9 38 Inteli AIO9 1 Image 9 39 Inteli AIO9 1 dimensions ...