Industrivej 62
DK-6740 Bramming
Denmark
Original
Revision:
2.0
IceTech R1000H
Table for Mechanical
Maintenance
Page:
1 of 3
Date:
05.04.16
Init:
JM
TABLE FOR MECHANICAL MAINTENANCE
Inspections to be carried out every day:
When the R1000H has been started up, it has to be checked that all heaters are working properly, see
on touch panel display for all the heat values. Before production is started, check physically that the
chambers and the other items in fact are heated up.
Inspections to be carried out every week:
Hydraulic station:
Inspect for oil leakages, Check hoses, fittings, valves and connections for leakages. Reseal if necessary.
Check the oil level, in the sight glass, on the hydraulic tank side. Refill if necessary.
Inspections to be carried out every 400 hours / 3 months:
The racks on the ejectors must be lubricated with grease.
Hydraulic station:
Check the oil. Drain a small quantity of oil – 1 dl – from the hydraulic tank. Inspect the oil visually. If the
oil is not clear, bright and light yellow it must be changed.
Get a particle analysis of the oil if in doubt about the contamination degree.
Cold Jet recommend the owner to have a spare part package in stock either the standard package or the
complete package, so repairs can be made quickly and with a very little loss of production time.
Spare part package complete
Cold Jet Part no.
504950
Spare part package standard
Cold Jet Part no.
504949
Содержание 514635
Страница 1: ...User s Manual Technical file 1 2 User s manual IceTech R1000H...
Страница 2: ...User s Manual 1 User s manual IceTech R1000H...
Страница 27: ...Technical file 2 User s manual IceTech R1000H...
Страница 29: ...Table for mechanical maintenance 1 Technical File IceTech R1000H...
Страница 33: ...Procedures for maintenance and repair 2 Technical File IceTech R1000H...
Страница 66: ...Alarm list 3 Technical File IceTech R1000H...
Страница 72: ...P I Diagram 4 Technical File IceTech R1000H...
Страница 77: ...Assembly drawings 5 Technical File IceTech R1000H...