Industrivej 62
DK-6740 Bramming
Denmark
Original
IceTech R1000H
Operator Manual for Reformer
Version:
1.0
Page:
21 from
23
Date:
30.08.17
Init.:
JM
=0 Pelletizer 1 stop
P01-DO07
P1 standby
=1 Pelletizer 1 Standby
=0 Pelletizer 1 resume production
24V DC
P01-DO08
P1 reset
=1 Pelletizer 1 reset alarm
24V DC
P01-DO09
P2 run
=1 Pelletizer 2 start
=0 Pelletizer 2 stop
24V DC
P01-DO10
P2 standby
=1 Pelletizer 2 Standby
=0 Pelletizer 2 resume production
24V DC
P01-DO11
P2 reset
=1 Pelletizer 2 reset alarm
24V DC
P01-DO12
P4 run*
=1 Flow wrapper start
=0 Flow wrapper stop
24V DC
P01-DO13
P4 reset*
=1 flow wrapper reset
24V DC
-P01-SO01
E-stop pelletizer
=1 E-stop sub group 1 OK
=0 E-stop sub group 1 not OK
24 V DC
-P01-SO02
E-stop flow wrapper
=1 E-stop sub group 2 OK
=0 E-stop sub group 2 not OK
24 V DC
*) Signals for P4 flow wrapper is located on Murr-box on in-feed conveyor.
Содержание 514635
Страница 1: ...User s Manual Technical file 1 2 User s manual IceTech R1000H...
Страница 2: ...User s Manual 1 User s manual IceTech R1000H...
Страница 27: ...Technical file 2 User s manual IceTech R1000H...
Страница 29: ...Table for mechanical maintenance 1 Technical File IceTech R1000H...
Страница 33: ...Procedures for maintenance and repair 2 Technical File IceTech R1000H...
Страница 66: ...Alarm list 3 Technical File IceTech R1000H...
Страница 72: ...P I Diagram 4 Technical File IceTech R1000H...
Страница 77: ...Assembly drawings 5 Technical File IceTech R1000H...