79
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020421 REV A - Jan 2019
Chapter 7: Turning Up the Cabinet Power System
This chapter describes how to turn up and test the cabinet power system. This process includes checking the AC power
supply voltage, installing rectifier modules into the optional Valere power shelf, installing batteries for reserve power, and
turning up and testing the DC power system.
Topics Covered
This chapter covers the following topics:
• Checking the cabinet ground connection.
• Checking the AC power supply voltage.
•
Installing rectifier modules into the optional Valere power shelf.
• Installing batteries for reserve power.
• Turning up and testing the DC power system.