101
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020421 REV A - Jan 2019
Step 3:
Step 4:
Step 5:
c.
Align the two captive screws on the assembly with the holes on the panel position. Secure the assembly in
place by tightening the two captive screws using a #2 Phillips screwdriver.
Route the OSP fiber cable into the splice compartment through one of the cutout locations in the compartment
wall (preferably through one with a pass-through fitting in place, installed previously).
Feed the OSP cable down into one of the cabinet's cable entry conduits (and out of the cabinet to the external
splicing location).
Repeat the steps above to install additional fiber termination assemblies, as needed.