3
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020421 REV A - Jan 2019
Chapter 4: Installing the Cabinet
51
Unpacking the Cabinet
52
Operating Cabinet Doors
53
Preparing the Cabinet for Installation
55
Installing the Cabinet on a Concrete Pad
56
Installing the Cabinet on a Pole
58
Installing the Cabinet on a Wall or H-Frame
60
Replacing the Lifting Eye Bolts
62
Chapter 5: Installing Power
63
Installing the Cabinet Ground Connection
64
Installing AC Power (220-240 VAC)
65
Installing AC Power (110-120 VAC)
66
Chapter 6: Installing and Splicing Outside Plant Cables 69
Installing Fiber Cables
70
Installing Outside Plant Fiber Cable
70
Splicing Fibers
72
Routing and Terminating Fibers
73
Installing Metallic Cables
74
Installing Outside Plant Metallic Cables
74
Splicing Metallic Cables
76
Installing 5-Pin Protection Modules
77
Sealing Cable Entry Locations
78
Chapter 7: Turning Up the Cabinet Power System
79
Checking the Ground Connection
80
Checking the AC Power Supply Voltage
81
Installing Rectifier Modules
83
Installing Batteries
85
Turning Up and Testing the DC Power System
87
Chapter 8: Installing Equipment and Adding Capacity 89
Installing a Protection Mounting Frame
90
Installing a Protection Block
91
Installing a Battery Compartment Riser
93
Installing a Battery Heater
95
Installing an AC Meter
96
Installing a Generator Connector
97