Contents
iv
Cisco UCS C210 Server Installation and Service Guide
OL-20887-02
Front Panel LEDs
3-2
Rear Panel LEDs
3-4
Preparing for Component Installation
3-7
Required Equipment
3-7
Shutting Down and Powering Off the Server
3-8
Removing and Replacing the Server in a Rack
3-9
Removing and Replacing the Server Top Cover
3-10
Removing and Replacing the Server Front Cover
3-11
Replaceable Component Locations
3-12
Installing or Replacing Components
3-13
Installing Hard Drives and Solid State Drives
3-14
Installing Power Supplies
3-16
Installing a DVD Drive
3-17
Installing a Fan Tray
3-19
Installing DIMMs
3-21
Memory Performance Guidelines and Population Rules
3-21
DIMM Installation Procedure
3-24
Installing CPUs and Heatsinks
3-26
Installing a Motherboard CMOS Battery
3-28
Installing a Trusted Platform Module (TPM)
3-29
Replacing a PCIe Riser Card Assembly
3-31
Replacing a PCIe Card (Network Adapters)
3-33
Special Considerations for the Cisco UCS P81E Virtual Interface Card (N2XX-ACPCI01)
3-35
How to Identify Which Power Supply Model is in Your Server
3-35
Replacing a PCIe Card (Mass Storage Controllers)
3-36
Replacing a SAS Extender or SAS Expander
3-39
The SAS Extender
3-39
The SAS Expander
3-39
Replacing a SAS Extender or SAS Expander Card
3-40
Replacing an LSI MegaRAID Battery Backup Unit
3-41
Installing a Mezzanine Card
3-43
A P P E N D I X
A
Technical Specifications
A-1
Physical Specifications
A-1
Environmental Specifications
A-2
Power Specifications
A-2
A P P E N D I X
B
Cable and Power Cord Specifications
B-1
KVM Cable
B-1
Содержание UCS C210
Страница 12: ...xii Cisco UCS C210 Server Installation and Service Guide OL 20887 02 ...
Страница 14: ...xiv Cisco UCS C210 Server Installation and Service Guide OL 20887 02 ...
Страница 38: ...2 20 Cisco UCS C210 Server Installation and Service Guide OL 20887 02 Chapter ...
Страница 92: ...B 8 Cisco UCS C210 Server Installation and Service Guide OL 20887 02 Appendix ...
Страница 100: ...C 8 Cisco UCS C210 Server Installation and Service Guide OL 20887 02 Appendix ...