2-5
Cisco UCS C210 Server Installation and Service Guide
OL-20887-02
Chapter
To install the slide rails and the server into a rack, follow these steps:
Step 1
Install the slide rails into the rack:
Tip
Use two people to help keep the slide rails and server level during installation. You can use a tape
measure and level or count the holes in the rack posts to ensure that the slide rails and server are level.
a.
Align the slide-rail assembly inside the rack posts with the length-adjustment bracket (item 4)
toward the rear of the rack (see
Figure 2-2
).
b.
Compress the length-adjustment bracket until the mounting pegs (item 6) and locking clips (item 5)
on the slide-rail assembly engage the desired rack holes on the front and rear rack posts.
If your rack has #10-32 rack-post holes, align the mounting pegs with the holes and then compress
the spring-loaded pegs to expose the #10-32 inner peg (see
Figure 2-3
).
Figure 2-2
Attaching a Slide-Rail Assembly
Note
The mounting pegs that protrude through the rack-post holes are designed to fit round or square #12-24
holes, or #10-32 holes when the mounting peg is compressed (see
Figure 2-3
). If your rack has #10-32
rack-post holes, align the mounting pegs with the holes and then compress the spring-loaded pegs to
expose the #10-32 inner peg.
1
Front-left rack post
2
Rear-left rack post
3
Slide-rail assembly
4
Length-adjustment bracket
5
Locking clip (one on each end of assembly)
6
Mounting pegs (two on each end of assembly)
1
3
5
2
6
4
195968
Содержание UCS C210
Страница 12: ...xii Cisco UCS C210 Server Installation and Service Guide OL 20887 02 ...
Страница 14: ...xiv Cisco UCS C210 Server Installation and Service Guide OL 20887 02 ...
Страница 38: ...2 20 Cisco UCS C210 Server Installation and Service Guide OL 20887 02 Chapter ...
Страница 92: ...B 8 Cisco UCS C210 Server Installation and Service Guide OL 20887 02 Appendix ...
Страница 100: ...C 8 Cisco UCS C210 Server Installation and Service Guide OL 20887 02 Appendix ...