1-67
Cisco ONS 15454 DWDM Procedure Guide, R8.0
78-17704-02
Chapter 1 Install the Shelf and Common Control Cards
NTP- G14 Install DWDM Equipment
Figure 1-31
Installing the Rear Cover
Step 6
Continue with the
“NTP-G14 Install DWDM Equipment” procedure on page 1-67
.
Stop. You have completed this procedure.
NTP-G14 Install DWDM Equipment
Step 1
Complete the
“DLP-G27 Install the DCU Shelf Assembly” task on page 1-68
as needed.
Step 2
Complete the
“DLP-G28 Install the Fiber Patch-Panel Tray” task on page 1-69
as needed.
Step 3
Complete the
“DLP-G29 Install the Fiber-Storage Tray” task on page 1-69
as needed.
Step 4
Complete the
“DLP-G371 Install the Ethernet Adapter Panel” task on page 1-70
as needed.
Step 5
Complete the
“DLP-G351 Install the Y-Cable Module Tray” task on page 1-71
as needed.
Step 6
Complete the
“DLP-G30 Install the FlexLayer Shelf” task on page 1-71
55374
RE
T 1
CA
UT
IO
N:
R
em
ov
e
po
we
r f
ro
m
b
oth
th
e
BA
T1
a
nd
te
rm
in
al
bl
oc
ks
pr
io
r t
o
se
rv
icin
g
SU
IT
AB
LE
F
O
R
M
O
UN
TIN
G
O
N
A N
O
N-
CO
M
BU
ST
IB
LE
S
UR
FA
CE
.
PL
EA
SE
R
EF
ER
T
O
IN
ST
AL
LA
TI
O
N
IN
ST
RU
CT
IO
NS
.
-4
2
TO
-5
7 V
dc
65
0 W
att
s
M
ax
im
um
BA
T
1
RE
T
2
BA
T 2
Purpose
This procedure installs the optional DWDM assemblies.
Tools/Equipment
#2 Phillips Dynamometric screwdriver
Crimping tool (large enough for #10 to #14 AWG)
#14 AWG wire
Prerequisite Procedures
NTP-G2 Install the Shelf Assembly, page 1-8
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None