1-35
Cisco ONS 15454 DWDM Procedure Guide, R8.0
78-17704-02
Chapter 1 Install the Shelf and Common Control Cards
NTP- G16 Connect the Office Ground to the ONS 15454 ANSI
Figure 1-16
Grounding the ONS 15454 ETSI
Step 9
Return to your originating procedure (NTP).
DLP-G16 Connect the Office Ground to the ONS 15454 ANSI
Purpose
This task connects ground to the ONS 15454 ANSI shelf.
Tools/Equipment
#2 Phillips Dynamometric screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Screws
Power cable (from fuse and alarm panel to assembly), #10 AWG, copper
conductors, 194 degrees F [90 degrees C])
Ground cable #6 AWG stranded
Listed pressure terminal connectors such as ring and fork types; connectors
must be suitable for #10 AWG copper conductors
Prerequisite Procedures
DLP-G13 Remove the Lower Backplane Cover, page 1-28
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
78101
FAN
FAIL
CRIT
MAJ
MIN
Ground