1-4
Cisco ONS 15454 DWDM Procedure Guide, R8.0
78-17704-02
Chapter 1 Install the Shelf and Common Control Cards
User-Supplied Materials (ANSI)
•
One or more of the following equipment racks:
–
19-inch ANSI Standard (Telcordia GR-63-CORE) (482.6 mm) rack; total width 22 inches
(558.8 mm)
–
23-inch ANSI Standard (Telcordia GR-63-CORE) (584.2 mm) rack; total width 26 inches
(660.4 mm)
•
Fuse panel
•
Power cable (from fuse and alarm panel to assembly), #10 AWG, copper conductors,
194 degrees Fahrenheit (90 degrees Celsius)
•
Ground cable #6 AWG stranded
•
Alarm cable pairs for all alarm connections, #22 or #24 AWG (0.51 mm² or 0.64 mm²), solid tinned
•
100-ohm shielded building integrated timing supply (BITS) clock cable pair #22 or #24 AWG
(0.51 mm² or 0.64 mm²), twisted-pair T1-type
•
Single-mode SC fiber jumpers with UPC polish (55 dB or better) for optical (OC-N) cards
•
Shielded coaxial cable terminated with SMB or BNC connectors for DS-3 cards
•
Shielded ABAM cable terminated with AMP Champ connectors or unterminated for DS1N-14 cards
with #22 or #24 AWG (0.51 mm² or 0.64 mm²) ground wire (typically about two ft [61 cm] in length)
•
6-pair #29 AWG double-shielded cable
•
Tie wraps and/or lacing cord
•
Labels
•
CLETOP cleaning cassette
•
Listed pressure terminal connectors such as ring and fork types; connectors must be suitable for
#10 AWG copper conductors
Tools Needed (ANSI)
The following tools are needed to install an ONS 15454 ANSI:
•
#2 Phillips Dynamometric screwdriver
•
Medium slot-head screwdriver
•
Small slot-head screwdriver
•
Wire wrapper
•
Wire cutters
•
Wire strippers
•
Crimp tool
•
BNC insertion tool
Test Equipment (ANSI)
The following test equipment is needed to install an ONS 15454 ANSI:
•
Voltmeter
•
Optical power meter (for use with fiber optics only)
•
Bit error rate (BER) tester, DS-1 and DS-3