Time and Date
Verified By
Activity
Task No.
Cable and interface equipment
evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment
(transceivers)
5
EMI evaluation:
• Distance limitations for
signaling
• Site wiring
• RFI levels
6
For power receptacles (depends on power supply), verify that each power supply installed in the chassis has
a dedicated AC source or DC source circuit.
Note
For UPS for power failures, refer to the power supply’s kVA rating as a sizing criteria in determining the
output required by the UPS.
Note
Catalyst 6840-X Switch Series Hardware Installation Guide
34
Preparing for Installation
Site Preparation Checklist
Содержание Catalyst 6816-X-LE
Страница 8: ...Catalyst 6840 X Switch Series Hardware Installation Guide viii Contents ...
Страница 32: ...Catalyst 6840 X Switch Series Hardware Installation Guide 20 Product Overview Rear Panel ...
Страница 64: ...Catalyst 6840 X Switch Series Hardware Installation Guide 52 Installing the Switch Online Diagnostics ...
Страница 96: ...Catalyst 6840 X Switch Series Hardware Installation Guide 84 Troubleshooting Finding the Serial Number ...