Table 13: Site-Planning Activities
Time and Date
Verified By
Activity
Task No.
Space evaluation:
• Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Maintenance access
1
Environmental evaluation:
• Ambient temperature
• Humidity
• Altitude
• Atmospheric contamination
• Airflow
2
Power evaluation:
• Input power type
• Power receptacles (Depends
on power supply)
• Receptacle proximity to the
equipment
• Dedicated (separate) circuits
for redundant power supplies
• UPS for power failures
• DC systems: Proper gauge
wire and lugs
3
Grounding evaluation:
• Circuit breaker size
• CO ground (AC- and
DC-powered systems)
4
Catalyst 6840-X Switch Series Hardware Installation Guide
33
Preparing for Installation
Site Preparation Checklist
Содержание Catalyst 6816-X-LE
Страница 8: ...Catalyst 6840 X Switch Series Hardware Installation Guide viii Contents ...
Страница 32: ...Catalyst 6840 X Switch Series Hardware Installation Guide 20 Product Overview Rear Panel ...
Страница 64: ...Catalyst 6840 X Switch Series Hardware Installation Guide 52 Installing the Switch Online Diagnostics ...
Страница 96: ...Catalyst 6840 X Switch Series Hardware Installation Guide 84 Troubleshooting Finding the Serial Number ...