background image

Catalyst 6840-X Switch Series Hardware Installation Guide

First Published:

2015-04-22

Last Modified:

2015-09-28

Americas Headquarters

Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000

800 553-NETS (6387)

Fax: 408 527-0883

Содержание Catalyst 6816-X-LE

Страница 1: ...ware Installation Guide First Published 2015 04 22 Last Modified 2015 09 28 Americas Headquarters Cisco Systems Inc 170 West Tasman Drive San Jose CA 95134 1706 USA http www cisco com Tel 408 526 4000 800 553 NETS 6387 Fax 408 527 0883 ...

Страница 2: ... Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Modifications to this product not authorized by Cisco could void the FCC approval and negate your authority to operate the product The Cisco implementation of TCP header...

Страница 3: ...P and SFP Transceiver Module Ports 9 Power Supply Slots 13 Management Port 13 Mini USB Type B Console Port 14 USB Type A Port 14 Console Port 14 System Reset Button 14 Fan Tray 14 LED Indicators 15 Status LED 17 System ID LED 17 Management Port LED 17 Fan Tray LED 17 Power Supply LEDs 18 Rear Panel 19 Preparing for Installation 21 C H A P T E R 2 Safety Warnings 21 Catalyst 6840 X Switch Series Ha...

Страница 4: ...Systems 31 Cabling Requirements 32 Site Preparation Checklist 32 Installing the Switch 35 C H A P T E R 3 Installation Tasks 35 Safety Warnings 36 Rack Mounting Guidelines 37 Unpacking the Switch 38 Chassis Installation Kits and Cable Guides 38 Installing the Switch Chassis 39 Installation Accessory Kits 39 L Brackets on the Chassis 39 Installing the L Brackets in a rack 40 Installing the L Bracke...

Страница 5: ...rview 53 Installing Power Supplies 55 Before You Begin 55 Inserting the Power Supply 55 Connecting to the Power Source 56 Before You Begin 56 Connecting to an AC Power Source 57 Connecting to a DC Power Source 57 Removing Power Supplies 59 Finding the Serial Number 59 Replacing the Fan Tray 61 C H A P T E R 5 Required Tools 61 Removing the Fan Tray 61 Installing the Fan Tray 62 Checking the Instal...

Страница 6: ...blems at the System Component Level 79 Identifying Startup Problems 80 Troubleshooting the Power Supply 80 Troubleshooting the Fan Tray 81 Status LED Indicators 82 Contacting Cisco Customer Service 82 Finding the Serial Number 83 Installing the USB Drivers 85 A P P E N D I X E Installing the Cisco Microsoft Windows USB Device Driver 85 Installing the Cisco Microsoft Windows XP USB Driver 85 Instal...

Страница 7: ...Using the Setup exe Program 86 Using the Add or Remove Programs Utility 87 Uninstalling the Cisco Microsoft Windows 7 USB Driver 87 Catalyst 6840 X Switch Series Hardware Installation Guide vii Contents ...

Страница 8: ...Catalyst 6840 X Switch Series Hardware Installation Guide viii Contents ...

Страница 9: ...hold down the Control key while you press the D key Keys are indicated in capital letters but are not case sensitive or Ctrl Commands and keywords and user entered text appear in bold font bold font Document titles new or emphasized terms and arguments for which you supply values are in italic font Italic font Terminal sessions and information the system displays appear in courier font Courier fon...

Страница 10: ...s Means reader take note Notes contain helpful suggestions or references to material not covered in the manual Note Means the following information will help you solve a problem Tip Means reader be careful In this situation you might do something that could result in equipment damage or loss of data Caution Means the described action saves time You can save time by performing the action described ...

Страница 11: ...vice Request For information on obtaining documentation submitting a service request and gathering additional information see the monthly What s New in Cisco Product Documentation which also lists all new and revised Cisco technical documentation at http www cisco com c en us td docs general whatsnew whatsnew html Subscribe to the What s New in Cisco Product Documentation as a Really Simple Syndic...

Страница 12: ...Catalyst 6840 X Switch Series Hardware Installation Guide xii Preface Obtaining Documentation and Submitting a Service Request ...

Страница 13: ...Panel Components on page 2 Rear Panel on page 19 Switch Models Table 1 Switch Models Description Switch Model 16 10 Gigabit SFP ports and two power supply slots Catalyst 6816 X LE 32 10 Gigabit SFP ports and two power supply slots Catalyst 6832 X LE 24 10 Gigabit SFP ports and two 40 Gigabit QSFP uplink ports and two power supply slots Catalyst 6824 X LE 40G 40 10 Gigabit SFP and two 40 Gigabit QS...

Страница 14: ...nents Figure 1 Catalyst 6816 X LE Console port RJ 45 Serial 6 16 10G SFP ports or 100 MB or 1G SFP fiber optic ports 1 Catalyst 6840 X Switch Series Hardware Installation Guide 2 Product Overview Front Panel Components ...

Страница 15: ...n 9 USB Type A host port 4 Two power supply slots 1 10 Ethernet management RJ 45 port 5 1 Power supplies that are ordered are installed in the switch If the second power supply is not ordered a blank panel is installed Catalyst 6840 X Switch Series Hardware Installation Guide 3 Product Overview Front Panel Components ...

Страница 16: ...onsole port RJ 45 Serial 6 32 10G SFP ports or 100 MB or 1G SFP fiber optic ports 1 Ethernet management SFP port 7 Grounding pad 2 Catalyst 6840 X Switch Series Hardware Installation Guide 4 Product Overview Front Panel Components ...

Страница 17: ...t 4 Two power supply slots 2 10 Ethernet management RJ 45 port 5 2 Power supplies that are ordered are installed in the switch If the second power supply is not ordered a blank panel is installed Catalyst 6840 X Switch Series Hardware Installation Guide 5 Product Overview Front Panel Components ...

Страница 18: ... Ethernet management SFP port 7 24 10G SFP ports or 100 MB or 1G SFP fiber optic ports 1 Two 40G QSFP uplink ports 8 Grounding pad 2 Catalyst 6840 X Switch Series Hardware Installation Guide 6 Product Overview Front Panel Components ...

Страница 19: ...supply slots 3 11 Ethernet management RJ 45 port 5 Console port RJ 45 Serial 6 3 Power supplies that are ordered are installed in the switch If the second power supply is not ordered a blank panel is installed Catalyst 6840 X Switch Series Hardware Installation Guide 7 Product Overview Front Panel Components ...

Страница 20: ... Two 40G QSFP uplink ports 7 40 10G SFP ports or 100 MB or 1G SFP fiber optic ports 1 Ethernet management SFP port 8 Grounding pad 2 Catalyst 6840 X Switch Series Hardware Installation Guide 8 Product Overview Front Panel Components ...

Страница 21: ...les provide copper or fiber optic connections to other devices These transceiver modules are field replaceable and provide the uplink interfaces when installed in an SFP module slot The SFP transceiver modules have LC connectors for fiber optic connections or RJ 45 connectors for copper connections For a list of supported SFP and SFP modules see the switch data sheet http www cisco com c en us pro...

Страница 22: ...G QSFP port of the switch on the other end Catalyst 6832 X LE Figure 6 10G native port numbering Table 3 Port mapping for Catalyst 6832 X LE Configurable 40 Gigabit ports 6 10 Gigabit ports 33 1 2 3 and 4 34 5 6 7 and 8 35 9 10 11 and 12 36 13 14 15 and 16 37 17 18 19 and 20 38 21 22 23 and 24 39 25 26 27 and 28 40 29 30 31 and 32 Catalyst 6840 X Switch Series Hardware Installation Guide 10 Produc...

Страница 23: ... 23 and 24 Configurable 10 Gigabit ports 8 40 Gigabit native ports 27 28 29 and 30 25 31 32 33 and 34 26 7 To configure 10G ports to function as 40G ports you need to use adapter cables that connect four 10G SFP ports of the switch on one end to a 40G QSFP port of the switch on the other end 8 To configure 40G ports to function as 10G ports you need to use Cisco QSFP to four SFP Active Optical Bre...

Страница 24: ...tive ports 43 44 45 and 46 41 47 48 49 and 50 42 9 To configure 10G ports to function as 40G ports you need to use adapter cables that connect four 10G SFP ports of the switch on one end to a 40G QSFP port of the switch on the other end 10 To configure 40G ports to function as 10G ports you need to use Cisco QSFP to four SFP Active Optical Breakout Cables that connect a 40G QSFP port of the switch...

Страница 25: ... port directly connected to the route processor The switch also has a fibre port that can be used as the Ethernet Management port It supports TFTP image downloading network management SNMP Telnet and SSH connections Flexible NetFlow export is not supported on the management port The management port is isolated from other ports in the system in a dedicated management VRF it is not part of the EARL ...

Страница 26: ...r which allows the Cisco IOS software to access the port The port supports Cisco USB flash drives with capacities from 128 MB to 8 GB USB devices with port densities of 128 MB 256 MB 1 GB 4 GB and 8 GB are supported Cisco IOS software provides standard file system access to the flash device read write erase and copy The software also provides the ability to format the flash device with a FAT file ...

Страница 27: ...eable the entire fan tray must be replaced in the event of a major fan tray failure See Removing the Fan Tray on page 61 for additional information about the fan Related Topics Front Panel Components Fan Tray LED on page 17 LED Indicators You can use the switch LEDs to monitor switch activity and performance You can also monitor the status of the fan tray assembly and the power supplies Catalyst 6...

Страница 28: ...Figure 9 Status Fan and System ID LEDs Catalyst 6840 X Switch Series Hardware Installation Guide 16 Product Overview LED Indicators ...

Страница 29: ... State The system needs attention Blinking blue Management Port LED This table describes the management port LEDs Table 9 Management Port LED Indicator Description Color State Port is not provisioned Off Port is provisioned but administratively not operational Amber Port is linked up Green A port fault is detected or the port beacon has been provisioned by the operator Alternating green and amber ...

Страница 30: ...y Green The fan tray has a failure Amber Related Topics Fan Tray on page 14 Power Supply LEDs The power supply includes LEDs on the front of the module The different states of the LEDs are described in the following table Figure 10 Power Supply LED Catalyst 6840 X Switch Series Hardware Installation Guide 18 Product Overview Power Supply LEDs ...

Страница 31: ...d fan failure conditions Blinking Off Power supply needs attention activated for events like high temperature high power or slow fan Off Blinking Input AC is present 3 3 voltage standby VSB is on and the power supply unit is switched off Off On Power supply is on and operates normally Rear Panel Figure 11 Rear Panel Fan trays 1 Catalyst 6840 X Switch Series Hardware Installation Guide 19 Product O...

Страница 32: ...Catalyst 6840 X Switch Series Hardware Installation Guide 20 Product Overview Rear Panel ...

Страница 33: ...ea can be accessed only through the use of a special tool lock and key or other means of security Statement 1017 Warning Read the installation instructions before connecting the system to the power source Statement 1004 Warning Site Requirements Planning a proper location for the switch and layout of the equipment rack or wiring closet is essential for successful system operation These sections de...

Страница 34: ... the afternoon Do not place the chassis next to a heat source of any kind including heating vents Adequate ventilation is particularly important at high altitudes Make sure that all the slots and openings on the system remain unobstructed especially the fan vent on the chassis Clean the installation site at regular intervals to avoid buildup of dust and debris which may cause a system to overheat ...

Страница 35: ...d rack allows an adequate flow of air through the switch chassis as follows If the difference between the measured intake air temperature and the exhaust air temperature does not exceed 10 C there is sufficient airflow in the rack If the difference in air temperature exceeds 10 C there is insufficient airflow to cool the chassis The 10 C temperature differential between the intake and the exhaust ...

Страница 36: ...cing and corona effects This condition may also cause sealed components with internal pressure such as electrolytic capacitors to fail or perform at reduced efficiency Dust and Particles Fans cool power supplies and system components by drawing in room temperature air and exhausting heated air out through various openings in the chassis However fans also ingest dust and other particles causing con...

Страница 37: ...terference can occur between the field and the signals on the wires This fact has two implications for the construction of plant wiring Bad wiring practice can result in radio interference emanating from the plant wiring Strong EMI especially when it is caused by lightning or radio transmitters can destroy the signal drivers and receivers in the chassis and even create an electrical hazard by cond...

Страница 38: ... all other appliances left on in the area may create large voltage spikes that may damage the system System Grounding You must install a system ground as part of the chassis installation process Chassis installations that rely only on the AC third prong ground are insufficient to adequately ground the systems Proper grounding practices ensure that the buildings and the installed equipment within t...

Страница 39: ...if possible and mitigate as closely as possible at the noise source or reduce coupling from the noise source to the victim equipment Medium Existing commercial building is not subject to natural environmental noise or man made industrial noise This building contains a standard office environment This installation has a history of malfunction due to electromagnetic noise Best grounding practices sh...

Страница 40: ...work alone if potentially hazardous conditions exist anywhere in your work space Never assume that power is disconnected from a circuit always check the circuit before working on it Look carefully for possible hazards in your work area such as damp floors ungrounded power extension cables frayed or damaged power cords and missing safety grounds If an electrical accident occurs proceed as follows U...

Страница 41: ...ge Damage To prevent ESD damage follow these guidelines Always use an ESD wrist strap and ensure that it makes maximum contact with bare skin ESD grounding straps are available with banana plugs metal spring clips or alligator clips All switch chassis are equipped with a banana plug connector identified by the ground symbol next to the USB port somewhere on the front panel If you have an older cha...

Страница 42: ...tch installation follow these requirements When installing two power supplies connect each power supply to a separate input power source If you fail to do this your system might be susceptible to total power failure due to a fault in the external wiring or a tripped circuit breaker To prevent a loss of input power be sure that the total maximum load on each source circuit is within the current rat...

Страница 43: ...For International Circuits should be sized according to local and national codes If you are using a 200 240 VAC power source in North America the circuit must be protected by a two pole circuit breaker The source AC outlet must be within 6 feet 1 8 meters of the system and should be easily accessible The AC power receptacles used to plug in the chassis must be the grounding type The grounding cond...

Страница 44: ...r supplies with multiple inputs each DC input must be protected by a dedicated circuit breaker or a fuse The circuit breaker or the fuse must be sized according to the power supply input rating and local or national electrical codes Cabling Requirements When running power and data cables together in overhead cable trays or subfloor cable trays be aware of the following caution We strongly recommen...

Страница 45: ... contamination Airflow 2 Power evaluation Input power type Power receptacles Depends on power supply Receptacle proximity to the equipment Dedicated separate circuits for redundant power supplies UPS for power failures DC systems Proper gauge wire and lugs 3 Grounding evaluation Circuit breaker size CO ground AC and DC powered systems 4 Catalyst 6840 X Switch Series Hardware Installation Guide 33 ...

Страница 46: ...e wiring RFI levels 6 For power receptacles depends on power supply verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit Note For UPS for power failures refer to the power supply s kVA rating as a sizing criteria in determining the output required by the UPS Note Catalyst 6840 X Switch Series Hardware Installation Guide 34 Preparing for Installation...

Страница 47: ...ng the switch can be broken down into a series of tasks which are described in the following table Description Task Remove the switch from the packaging materials Save the packaging material for later use if you need to move the chassis Note Unpacking the switch Install the switch Installing the switch Construct and attach a system ground wire from the building earth ground to the system ground po...

Страница 48: ...estricted access area can be accessed only through the use of a special tool lock and key or other means of security Statement 1017 Warning This unit might have more than one power supply connection All connections must be removed to de energize the unit Statement 1028 Warning Only trained and qualified personnel should be allowed to install replace or service this equipment Statement 1030 Warning...

Страница 49: ...ctivities were completed Rack Mounting Guidelines The switch is designed to be installed in standard 19 inch racks Note Before rack mounting the switch ensure that the equipment rack complies with the following guidelines The width of the rack measured between the two front mounting strips or rails must be one of the following measurements 17 5 inches 44 45 cm 17 75 inches 45 09 cm The depth of th...

Страница 50: ...You should also allow a minimum separation of 12 inches 30 5 cm between the hot air exhaust on one chassis and the air intake on another chassis Failure to maintain adequate air space can cause the chassis to overheat and the system to fail Note Unpacking the Switch Do not discard the shipping container when you unpack the switch Flatten the shipping cartons and store them with the pallet You will...

Страница 51: ...ll 10 32 or 12 24 clip nuts or cage nuts to secure the rack mount screws The clip nuts or the cage nuts are not included as part of the accessory kit and must be obtained on your own Note The accessory kit also contains the following Cable guides Two cable guides can be installed on the front of the chassis using the same sets of screws that secure the chassis rack mount brackets to the rack posts...

Страница 52: ... follow the steps in Installing the L Brackets on a Rack with 17 5 in 44 45 cm Opening on page 40 If the distance between the insides of the rails is 17 75 inches 45 09 cm then follow the steps in Installing the L Brackets on a Rack with 17 75 in 45 09 cm Opening on page 41 Installing the L Brackets on a Rack with 17 5 in 44 45 cm Opening Procedure Step 1 Attach the L bracket to the chassis as sho...

Страница 53: ...re 17 Attaching the L Bracket to the chassis Step 2 Position the chassis in the rack and align the mounting holes in the L bracket with the mounting holes in the equipment rack Step 3 Secure the chassis using four screws through the holes in the L bracket and into the rack post holes Catalyst 6840 X Switch Series Hardware Installation Guide 41 Installing the Switch Installing the L Brackets on a R...

Страница 54: ...ned so the front of the chassis is approximately flush with the front of the rack The chassis is shipped with the L brackets in the correct location there is no need to move them Positioned so approximately one fourth of the chassis protrudes in front of the rack Remove the screws in the L brackets Reposition the L brackets to align with the first set of holes behind the holes where the L brackets...

Страница 55: ...d the front of the chassis is approximately flush with the front of the rack 2 Step 2 Rest the back end of the chassis on the rack mount shelf and carefully slide the chassis into the rack until the L brackets meet the front rails of the rack system Step 3 Locate the rack post holes that align with the chassis L bracket holes If the rack post holes are prethreaded determine if the threads are 10 3...

Страница 56: ...Secure the chassis using four screws through the holes in the L bracket and into the rack post holes Figure 21 Installing the Cable Mount Guides 10 32 or 12 24 screws 1 What to do next After installing the chassis in its location complete the installation process by following these procedures Catalyst 6840 X Switch Series Hardware Installation Guide 44 Installing the Switch Installing the Chassis ...

Страница 57: ...er rack or system power ground connections that you make The system ground connection is required if FXS modules are installed or if this equipment is installed in a U S or European Central Office You must connect both the system ground connection and the power supply ground connection to an earth ground The system ground connection is required if FXS modules are installed or if this equipment is ...

Страница 58: ...cilities No 1 Phillips screwdriver Crimping tool to crimp the grounding wire to the grounding lug Wire stripping tool to remove the insulation from the grounding wire Connecting the System Ground To establish an earth ground for the chassis you must attach a grounding cable from the chassis grounding lug to the rack Before you begin Review the following illustration and table Figure 22 System Grou...

Страница 59: ...sole port on the supervisor engine allows you to perform the following functions Configure the switch from the CLI Monitor network statistics and errors Configure SNMP agent parameters Download software updates to the switch or distribute software images residing in flash memory to attached devices The console port is located on the front panel of the chassis The accessory kit that shipped with yo...

Страница 60: ...e fiber optic cable until you are ready to connect the cable The plugs and caps protect the module ports and cables from contamination and ambient light Removing and installing an SFP transceiver module can shorten its useful life Do not remove and insert any SFP transceiver module more often than is necessary To prevent ESD damage follow your normal board and component handling procedures when co...

Страница 61: ...n place If you are inserting the SFP transceiver module in the lower ports you need to invert the module Note Step 6 Remove the SFP dust plugs and save Step 7 Connect the SFP cables Figure 24 Port with SFP Transceiver Modules Installed Catalyst 6840 X Switch Series Hardware Installation Guide 49 Installing the Switch Installing SFP and SFP Transceiver Modules ...

Страница 62: ...hese tests allow you to perform a complete sanity check on the system prior to inserting the system into your network and to monitor the health of the system while the system is running Refer to the Online Diagnostics section on page 3 19 for further information When prestaging systems in a nonproduction environment we recommend that you run all diagnostic tests including the disruptive tests to p...

Страница 63: ... of the above tests at user designated intervals For complete information on the online diagnostic tests and how to run them refer to the software configuration guide Catalyst 6840 X Switch Series Hardware Installation Guide 51 Installing the Switch Online Diagnostics ...

Страница 64: ...Catalyst 6840 X Switch Series Hardware Installation Guide 52 Installing the Switch Online Diagnostics ...

Страница 65: ...ing Power Supplies on page 55 Removing Power Supplies on page 59 Finding the Serial Number on page 59 Power Supply Overview You can install two types of power supplies in the chassis Figure 25 Cisco Catalyst 6840 X AC Input Power Supply Catalyst 6840 X Switch Series Hardware Installation Guide 53 ...

Страница 66: ...able lists the power supply models Description Part Number Cisco Catalyst 6840 X power supply AC 750W C6840 X 750W AC Cisco Catalyst 6840 X power supply DC 750W C6840 X 750W DC Cisco Catalyst 6840 X power supply AC 1100W C6840 X 1100W AC Cisco Catalyst 6840 X power supply DC 1100W C6840 X 1100W DC The power supplies can work together in Redundant Mode in which each power supply operates at approxi...

Страница 67: ...For installations outside the U S consult your local and national electrical codes The length of the grounding wire depends on the proximity of the switch to proper grounding facilities Inserting the Power Supply To insert the power supply into the chassis follow these steps Procedure Step 1 Remove the blank cover and store it for future use Step 2 Verify that the power supply is not connected to ...

Страница 68: ...ower sources within reach of the power supply cables If you are connecting to a DC power check that you are using 8 24 AWG power cables to connect to the power supply The 8 24 AWG wire size applies to the negative and positive cables that connect to negative and positive apertures on the connector You have to procure the power cable If you are installing more than one DC input power supply each mu...

Страница 69: ...power source supplied by the data center When using redundant mode connect each power supply to a separate power source Note Step 3 Verify that the power supply is receiving power and outputting DC power by checking that the OK LED is on and is not yellow or blinking green For an explanation of all the power supply LEDs and the conditions that they indicate see Power Supply LEDs When you first act...

Страница 70: ...hat your local electrical code calls for Step 3 Strip 1 2 of insulation off the DC wires that you are using Step 4 Insert the black DC negative wire into the right aperture on the connector and tighten down the connection set screw Finger tight or about 3 ft lbs should be sufficient Step 5 Insert the red DC positive wire into the left aperture on the connector and tighten down the connection set s...

Страница 71: ...ess the ejector latch on the right of the power supply b Pull the power supply partially out of the slot by its handle c Pull the power supply fully from the slot If you intend to operate the switch without installing another power supply in the empty slot then you must reinstall the blank cover over the empty power supply slot to ensure proper air flow in the system and for safety reasons Caution...

Страница 72: ...Figure 29 Serial Number on the AC Power Supply Catalyst 6840 X Switch Series Hardware Installation Guide 60 Installing and Removing Power Supplies Finding the Serial Number ...

Страница 73: ...the Fan Tray The fan tray is designed to be removed and replaced while the system is operating without presenting an electrical hazard or damage to the system You have 120 seconds to remove and insert of the fan tray under specified ambient operating temperatures Note The fans might still be turning when you remove the fan from the chassis Keep fingers screwdrivers and other objects away from the ...

Страница 74: ...e chassis and set it aside Installing the Fan Tray Procedure Step 1 Position the fan tray with the captive installation screws in front of the fan tray cavity at the rear of the chassis Step 2 Place the fan tray into the chassis cavity so that the pin on the fan tray assembly is aligned with the hole on the chassis Step 3 Push the fan tray into the chassis until the power connector seats in the ba...

Страница 75: ... or if you experience trouble with the installation for instance if the captive installation screws do not align with the chassis holes contact a Cisco customer service representative for assistance Finding the Fan Serial Number If you contact Cisco Technical Assistance you need to know the fan serial number This figure shows where the serial number is located You can also use the show version pri...

Страница 76: ...Figure 31 Serial Number on the Fan Catalyst 6840 X Switch Series Hardware Installation Guide 64 Replacing the Fan Tray Finding the Fan Serial Number ...

Страница 77: ... F 0 to 40 C 32 F to 104 F 0 to 40 C Temperature operating 4 to 149 F 20 to 65 C 4 to 149 F 20 to 65 C 4 to 149 F 20 to 65 C 4 to 149 F 20 to 65 C Temperature nonoperating and storage 0 5 C per minute hot to cold 0 33 C per minute cold to hot 0 5 C per minute hot to cold 0 33 C per minute cold to hot 0 5 C per minute hot to cold 0 33 C per minute cold to hot 0 5 C per minute hot to cold 0 33 C per...

Страница 78: ...s Height 3 47 inches 8 81 cm Width 17 35 inches 44 07 cm Depth 21 8 inches 55 38 cm Rack Units RU 2 RU Dimensions 37 03 lbs 16 8 kgs 34 83 lbs 15 8 kgs 33 95 lbs 15 4 kgs 24 04 lbs 10 09 kgs Weight Chassis with 2 power supplies and a built in fan C6840 X FAN The airflow in the Catalyst 6840 X switch chassis is from front to back See Site Requirements on page 21 for recommended separations between ...

Страница 79: ...hour 2559 BTU hour 2559 BTU hour British thermal units BTUs 4msec at 100 load 16 milliseconds at 100 load 4msec at 100 load 16 milliseconds at 100 load Output holdup time 5C to 55C at 1800m 6000ft Operating temperature 5C to 55o c at 1800m 6000ft 5C to 55C at 1800m 6000ft Operating temperature 5C to 55o c at 1800m 6000ft Environmental conditions Power Supply AC Power Cords The following table list...

Страница 80: ...meter CAB 9K10A UK Power Cord 125VAC 13A NEMA 5 15 Plug North America 2 5 meter CAB 9K12A NA North America NEMA L6 20 250V 20A plug IEC320 C13 receptacle 2 0 meter CAB AC 250V 13A Power Cord 200 240V 6A North America 2 5 meter CAB N5K6A NA Cabinet Jumper Power Cord 250 VAC 10A C14 C13 Connectors 0 7 meter CAB C13 CBN Power Cord Jumper C13 C14 Connectors 2 Meter Length 2 meter CAB C13 C14 2M Power ...

Страница 81: ...08 W 9 A FAN 2559BTU HR 750 W 2559BTU HR 750 W 420 W 35 A Catalyst 6816 X LE 2559BTU HR 750 W 2559BTU HR 750 W 620 W 52 A Catalyst 6832 X LE 2559BTU HR 750 W 2559BTU HR 750 W 620 W 52 A Catalyst 6824 X LE 40G 3753BTU HR 1100 W 3753BTU HR 1100 W 900 W 75 A Catalyst 6840 X LE 40G Catalyst 6840 X Switch Series Hardware Installation Guide 69 Technical Specifications Chassis and Module Power and Heat V...

Страница 82: ...Catalyst 6840 X Switch Series Hardware Installation Guide 70 Technical Specifications Chassis and Module Power and Heat Values ...

Страница 83: ...se of the dielectric properties of the materials used in their construction Always ground the cables especially in new cable runs to a suitable and safe earth ground before connecting them to the module Caution To comply with GR 1089 intrabuilding and lightning immunity requirements you must use a foil twisted pair FTP cable that is properly grounded at both ends Caution LC Connector The LC fiber ...

Страница 84: ...ions refer to the following notes Cisco SFP and SFP Transceiver Module Installation Notes Cisco 40 Gigabit QSFP Transceiver Modules Installation Note Each port must match the wave length specifications on the other end of the cable and the cable must not exceed the stipulated cable length Copper 1000BASE T SFP module transceivers use standard four twisted pair Category 5 cable at lengths up to 328...

Страница 85: ...outside of the left plug should be a different color from the wire connected to the pin on the inside of the right plug Figure 38 Identifying a Crossover Cable Console Port Adapter Pinouts The RS 232 console port uses an 8 pin RJ 45 connector Use an RJ 45 to DB 9 adapter cable to connect the switch console port to a console PC You need to provide a RJ 45 to DB 25 female DTE adapter to connect the ...

Страница 86: ...ic connectors are used to connect two fibers together When these connectors are used in a communications system proper connection becomes a critical factor Fiber optic cable connectors can be damaged by improper cleaning and connection procedures Dirty or damaged fiber optic connectors can result in communication that is not repeatable or is inaccurate Fiber optic connectors differ from electrical...

Страница 87: ...lines Connectors that are used inside the system are cleaned by the manufacturer and connected to the adapters in a proper manner The operation of the system will be error free if the customer provides clean connectors on the application side and follows these guidelines Does not clean the inside of the connector adapters Does not use force or quick movements when connecting the fiber optic connec...

Страница 88: ...ct the ferrule at an angle Do not look directly into the aperture Repeat the process if any contamination is detected Catalyst 6840 X Switch Series Hardware Installation Guide 76 Module Connectors and Cable Specifications Module Connectors and Cable Specifications ...

Страница 89: ...material around the chassis Step 4 Place the power supplies in the spaces provided in the power supply packing material Step 5 Place the top packing material over the top of the chassis and power supplies Step 6 Place the rack mount kit and the accessory kit on the top packing material You must include the accessory kit for the final packaging to fit properly Note Step 7 Place the outside carton o...

Страница 90: ... tightly around the top and bottom of the package to hold the outside carton and the bottom pallet together Figure 40 Final Package Catalyst 6840 X Switch Series Hardware Installation Guide 78 Repacking the Switch Repacking the Switch ...

Страница 91: ...3 Getting Started When the initial system startup is complete verify the following Power supplies are supplying power to the system The fan tray assembly is operating System software boots successfully If one or more of the above conditions are not met use the procedures described in this chapter to isolate and if possible resolve the problem If all of the above conditions are met and the hardware...

Страница 92: ...nctioning normally and that the fan tray assembly is faulty contact a customer service representative Step 2 If the startup information and system banner do not display at startup verify that the terminal is set correctly and that it is connected properly to the console port Troubleshooting the Power Supply If the OK LED does not light after you turn on the power switch follow these steps to isola...

Страница 93: ...ervice on page 82 Troubleshooting the Fan Tray To isolate a fan tray problem follow these steps Procedure Step 1 Verify that the FAN LED on the fan tray is green If the FAN LED is not green see Contacting Cisco Customer Service on page 82 to determine whether or not the power subsystem is functioning properly Step 2 Check to determine if the FAN LED is amber If the FAN LED is amber the fan tray is...

Страница 94: ... after 5 minutes If minor alarm monitor the condition Redundant supervisor engine temperature sensor exceeds major or minor threshold Major Minor Red Orange Contacting Cisco Customer Service If you are unable to solve a startup problem after using the troubleshooting suggestions in this chapter contact a Cisco customer service representative for assistance and additional instructions Before you ca...

Страница 95: ...tch serial number The figure shows where the serial number is located You can also use the show version privileged EXEC command to see the serial number Figure 41 Serial Number on the Chassis Catalyst 6840 X Switch Series Hardware Installation Guide 83 Troubleshooting Finding the Serial Number ...

Страница 96: ...Catalyst 6840 X Switch Series Hardware Installation Guide 84 Troubleshooting Finding the Serial Number ...

Страница 97: ...tware Note Step 2 If using 32 bit Windows XP double click the setup exe file in the Windows_32 folder If using 64 bit Windows XP double click the setup x64 exe file in the Windows_64 folder Step 3 The Cisco Virtual Com InstallShield Wizard begins Step 4 The Ready to Install the Program window appears Click Install Step 5 The InstallShield Wizard Completed window appears Click Finish Step 6 Connect...

Страница 98: ...file in the Windows_32 folder If using 64 bit Windows 7 double click the setup x64 exe file in the Windows_64 folder Step 3 The Cisco Virtual Com InstallShield Wizard begins Click Next Step 4 The Ready to Install the Program window appears Click Install If a User Account Control warning appears click Allow I trust this program to proceed Note Step 5 The InstallShield Wizard Completed window appear...

Страница 99: ...p 3 When the Program Maintenance window appears select the Remove radio button Click Next Uninstalling the Cisco Microsoft Windows 7 USB Driver Before you begin Disconnect the switch console terminal before uninstalling the driver Procedure Step 1 Run setup exe for Windows 32 bit or setup x64 exe for Windows 64bit Click Next Step 2 The InstallShield Wizard for Cisco Virtual Com appears Click Next ...

Страница 100: ...Catalyst 6840 X Switch Series Hardware Installation Guide 88 Installing the USB Drivers Uninstalling the Cisco Microsoft Windows 7 USB Driver ...

Отзывы: