80
DWU951 (DD1-WU80P/81P) / DWX951 (DD1-WX80P/81P) / DXG1051 (DD1-X100P/101P)
DWU951/DWX951/DXG1051 Service Manual
020-000674-01 Rev.1 (01-2014)
Page 80 / 118
Assembling
1) Attach the BATTERY PCB and the battery
holder in place on the bottom case and screw
down.
2) Attach the POWER INTAKE FAN in place.
3) Wire the CNAC1/2 as shown.
4) Put the POWER UNIT COOLING in place and
screw down. Put the earthing terminal and
screw down.
Wire CNAC1/2 as
this location
Wire CNAWV
through this groove
Wire CNAC1/2
through these
clamps
T3x12 black
screws
Torque: 0.68-0.88Nm
5) Connect CNAC, CNAC1/2 and CNACR to the POWER UNIT COOLING and wire them as below.
6) Connect CNAWV to the AC WATCH PCB and wire it as below.
7) Screw down the grounding wire of CNAC to the bottom case as below
Torque: 0.39-0.59N
䞉
m
Screw
M4x8 silver
Earthing
terminal
5) Connect CNAC, CNAC1/2 and CNACR to the POWER UNIT COOLING and wire them as below.
6) Connect CNAWV to the AC WATCH PCB and wire it as below.
7) Screw down the grounding wire of CNAC to the bottom case as below.
8) Put the AC holder and the AC shield in place and screw them down.
[CAUTION]
Wire CNAC1/2 th
U
ough
this cut out part.
Tie CNAC1 and CNAC2 with a
cable tie at 15 mm from the
edge of CNAC1 connector.
CNAC
CNAC1
CNAC2
CNACR
AC WATCH PCB
Wire CNAWV through this hole
CNAWV
Wire CNAWV beneath the board
CNAC
Torque: 0.39-0.59N
䞉
m
Screw
M4x8 silver
Содержание DD1-WU80P
Страница 1: ...DWU951 DWX951 DXG1051 Service Manual 020 000674 01...
Страница 2: ......
Страница 120: ...DWU951 DWX951 DXG1051 DWU951 DWX951 DXG1051 Service Manual 020 000674 01 Rev 1 01 2014 Page 118 118...
Страница 149: ......
Страница 150: ......