Before You Install
1-3
Pedestal
•
Main body
•
Pedestal Covers (3)*
•
Pedestal CMK Spacer (attached)
•
8-32 X 3/8” Screws (4)
*Only two pedestal covers are needed. One can be
discarded depending on whether a Cord Management Kit
(CMK) is being installed.
NOTE:
To prepare the installation site for installing a
pedestal mount, you will also need the contents of the
Pedestal Mount Kit, which ships separately (see
Appendix B).