1-1
Before You Install
1
Site Prerequisites
Ensure that the location of the installation site is appropriate and you are ready to install the CPF25:
•
The CPF25 must be located within 150’ line-of sight from a CPGW (ChargePoint Gateway).
•
Ensure that the appropriate wiring, circuit protection, and metering is in place at the installation location by
reviewing the specifications, wiring diagrams, and grounding requirements described in Appendix A.
•
Prepare the installation site by following the instructions in Appendix B. The mounting template for the
pedestal is stapled into the center fold of this document and a PDF version is available at
http://www.chargepoint.com/support-guides/. Ensure the PDF version is accurate by printing it at 100% scale
on 11” x 17” paper and then verifying at least one dimension.
Required Tools
•
Ratchet and 3/8” (10 mm) and 7/16” (11 mm) Sockets
•
1/2” Drive Torque Wrench (rated to at least 100 ft-lbs)
•
15/16” (24 mm) 6-point Deep Socket, for 5/8” nut
•
Adjustable Wrench
•
Bubble Level
•
#2 Phillips Screwdriver
•
Wire Stripper
•
Voltage Tester
•
T10 Torx Driver
NOTE:
The tools listed above do not include the tools and supplies needed to prepare the installation site
(described in Appendix B).
Overview of Steps
1.
Check Shipping Boxes for Correct Contents (described on the next page)
2.
Install the Pedestal (see Section 2)
3.
Attach Bracket (and CMK, if applicable) to Pedestal (see Section 3)
4.
Install the Stations and Charging Cords (see Section 4)
5.
Prepare to Activate on ChargePoint (see Section 5)
You must be a licensed electrician and complete an online training class
(
http://chargepointuniversity.netexam.com/)
to become a ChargePoint Certified Installer, and to
get a login for ChargePoint. If you do not complete this training, you will be unable to complete the
installation process.
DANGER: RISK OF SHOCK
Turn off the circuit breaker and do not restore power until installation is complete.
Failure to follow these instructions could result in shock or electrocution.