Prepare to Activate on ChargePoint

5-3

Step 2: Document the Radio Group

A radio group consists of a ChargePoint Gateway and up to nine CPF25 charging stations that it communicate with over WiFi. 
For each radio group, attach the spare activation labels below to document how stations are organized. After completing this 
step and the checklist on the following page, provide this information to the person responsible for activating the gateway 
and the CPF25 charging stations. If installing multiple radio groups, use one page for each radio group (this page is included in 
all Installation Guides). 

Gateway

CPF25

CPF25

CPF25

CPF25

CPF25

CPF25

CPF25

CPF25

CPF25

NOTE: 

Up to nine CPF25s can communicate with a 

ChargePoint Gateway.

attach spare activation 

label here

attach spare activation 

label here

attach spare activation 

label here

attach spare activation 

label here

attach spare activation 

label here

attach spare activation 

label here

attach spare activation 

label here

attach spare activation 

label here

attach spare activation 

label here

attach spare activation 

label here

Содержание CPF25

Страница 1: ...CPF25 Pedestal Mount Charging Stations Installation Guide ChargePoint Inc 254 East Hacienda Avenue Campbell CA 95008 USA US toll free 1 877 850 4562 www chargepoint com...

Страница 2: ...3 7 3 4 Dual Station with Cord Management 3 10 4 Install Station s and Charging Cord s Step 3 Mount the Station s 4 1 Step 4 Connect the Service Wiring 4 2 Step 5 Connect the Charging Cord s 4 3 Step...

Страница 3: ...Wrench rated to at least 100 ft lbs 15 16 24 mm 6 point Deep Socket for 5 8 nut Adjustable Wrench Bubble Level 2 Phillips Screwdriver Wire Stripper Voltage Tester T10 Torx Driver NOTE The tools listed...

Страница 4: ...T10 Torx Screws 2 Spare Activation Label 1 A duplicate label is attached to the inside of the main unit KEEP this spare label because it contains important information that is needed to activate the s...

Страница 5: ...Screws 4 Only two pedestal covers are needed One can be discarded depending on whether a Cord Management Kit CMK is being installed NOTE To prepare the installation site for installing a pedestal mou...

Страница 6: ...k Washers 4 Single Station with Cord Management Bracket 20 x 4 Screws 4 Lock Washers 4 Dual Station no Cord Management Main Bracket Bottom Bracket Cover Internal Bracket 10 32 x 4 screws 4 8 32 x 3 8...

Страница 7: ...u Install 1 5 Cord Management Kit CMK If you ordered the optional cord management kit it ships in a box containing Cord management assembly with pre installed EV CHARGING ONLY sign 1 Cable clamps 2 ex...

Страница 8: ...the 5 8 nuts and washers and the 1 2 drive torque wrench with 15 16 deep socket as shown Adjust the lower nuts as necessary to ensure the mounting pole is level When level tighten the nuts on top of...

Страница 9: ...wn Tighten the screws using a Phillips screwdriver NOTE As illustrated the cover you use at the back of the pedestal depends on whether your station includes a Cord Management Kit CMK Discard the extr...

Страница 10: ...and its associated components to the pedestal Follow the steps associated with the particular CPF25 model you are installing Single Station no Cord Management see page 3 3 Single Station with Cord Man...

Страница 11: ...installing the charging station IMPORTANT Do not unwrap the ropes Remove and discard the two 3 8 drive shipping screws from the front face of the CMK NOTE When you remove the shipping screws the coun...

Страница 12: ...in front of the pedestal 3 Reinstall the ground lug to the pedestal using the 7 16 wrench and the two 1 4 x20 screws you removed 4 Run the remaining service wiring through the opening in front of the...

Страница 13: ...bracket and into the stand offs on the pedestal Tighten using a Phillips screwdriver 7 Route the service wiring through the wiring hole in the front of the bracket You have now completed installation...

Страница 14: ...ound lug then run a 10 gauge ground wire from the ground lug through the wiring opening in front of the pedestal 3 Reinstall the ground lug to the pedestal using the 3 8 wrench and the two screws you...

Страница 15: ...old the CMK against the back of the pedestal while aligning the four 4 screws inserted in the previous step into the corresponding holes in the CMK NOTE The spacer on the pedestal should slide into th...

Страница 16: ...nd wire from the service wiring to the ground lug then run two 10 gauge ground wires from the ground lug through the wiring opening in front of the pedestal 4 Reinstall the ground lug to the pedestal...

Страница 17: ...nding holes in the pedestal 7 Fasten the main bracket to the pedestal using 10 32 x 4 screws and lock washers at the top and two 10 32 x 4 screws and spacers at the bottom 8 Route the service wiring t...

Страница 18: ...its holes with the main bracket and fastening to the main bracket using two 8 32 x 3 8 screws on each side You have now completed installation of the bracket and are ready to install the stations and...

Страница 19: ...through the opening in the front of the pedestal If installing the Power Share kit follow the steps in Appendix B before continuing 6 Insert the four 4 long 1 4 x 20 screws Install lock washers on ea...

Страница 20: ...e main bracket with the corresponding holes in the top internal brace 10 Route the service wiring each of the wiring holes located in the left front corner of each main bracket 11 Fasten the main brac...

Страница 21: ...its holes with the main bracket and fastening it to the main bracket using two 8 32X3 8 screws on each side You have now completed installation of the bracket and CMK and are ready to install the sta...

Страница 22: ...and the bracket Position the mounting skirt against the back of the main unit as shown and hold it in place while hanging the main unit on the protruding top screw Route the service wiring through the...

Страница 23: ...ng can easily reach the connectors on the charging station s terminal block 2 Strip each wire 1 2 3 Fully insert wires into the connectors on the left side of the terminal block as shown 4 On each con...

Страница 24: ...s into the corresponding connectors on the right side of the terminal block as shown 3 On each connector press the white clip all the way down until it snaps into place CAUTION Ensure each wire is ful...

Страница 25: ...Place the wire cover over the exposed wiring on the terminal block Using a coin lock the wire cover in place as shown NOTE To avoid damage do not use a screwdriver 2 Place the cover over the front of...

Страница 26: ...d to remove any twist or kinks 2 Align the knot bearing on each rope to its corresponding mating feature on the cable clamp Turn the knot bearing clockwise approximately 1 4 turn You may need to push...

Страница 27: ...the shipping box with each main unit The exact location to the parking space where the CPF25 is physically installed A smart phone with Internet access Installer account information user name and pass...

Страница 28: ...share your GPS location data with the ChargePoint mobile site 6 When prompted touch OK to review the station s location on GoogleTM Maps 7 Review the station address and zoom in to review the initial...

Страница 29: ...eway and the CPF25 charging stations If installing multiple radio groups use one page for each radio group this page is included in all Installation Guides Gateway CPF25 CPF25 CPF25 CPF25 CPF25 CPF25...

Страница 30: ...nnections are clean and snug Electrical enclosures are clean and free of wire strands and metal shavings All covers are installed and all fasteners are tightened The LED located at the bottom of the C...

Страница 31: ...powered on and activated the status light on the front of the station illuminates as follows OFF Idle including vehicle plugged in but not authorized Pulsing Yellow Authorization in progress Pulsing...

Страница 32: ...y and smoothly it is likely that it s rope has come off the pulley and you must re position it You will need T25 L wrench Follow these steps 1 Using the T25 L wrench loosen the set screws on each side...

Страница 33: ...the rope that doesn t move freely is facing towards you 4 Inspect the rope to ensure it is properly aligned onto the pulley 5 Carefully lower the weight back into the retractor 6 Rotate the top cap b...

Страница 34: ...installed as part of the make ready Connector Type SAE J1772TM Cable Length 6 Cable Management 18 5 5 meters Cable Length 8 Cable Management 23 7 0 meters Overhead Cable Management System Yes Card Re...

Страница 35: ...C Article 625 compliant Surge Protection 6kV 3000A In geographic areas subject to frequent thunder storms supplemental surge protection at the service panel is recommended EMC Compliance FCC Part 15 C...

Страница 36: ...A 3 Wiring Diagram The following illustrations describes the wiring for installing a CPF25...

Страница 37: ...und Connect to these systems In a wye system connect the station to ANY two lines as shown below In a delta system connect the station to a center tapped secondary only where the center tap is bonded...

Страница 38: ...se components are included in the shipping box with the pedestal and can also be purchased from ChargePoint by ordering a CPF25 Pedestal Mount Kit 8 32 X 3 8 Screws 4 5 8 11 X 9 Grade 55 Bolts 4 5 8 1...

Страница 39: ...on site and that the conduit and service wiring is positioned as described on the installation template It is recommended that a jig be created to position the conduit before pouring the concrete Foll...

Страница 40: ...adjust these instructions to comply with codes that apply at your installation location Tools Required Electric drill or Hammer drill 1 2 chuck may be required depending on drill bits used Consumable...

Страница 41: ...e until it hardens Place the plug over the long end of a bolt and then use the bolt to push the plug to the bottom of the hole 6 Fill each hole with epoxy to about 2 1 2 to 3 below the top Continue im...

Страница 42: ...ed parking platform check to make sure that all pedestal mounting components are readily available at the installation site Always check local codes to ensure compliance Ensure you have adequate wirin...

Страница 43: ...s shown 1 Run the L1 and L2 service wires into the hole into the hole in the bottom of the junction box NOTE Maximum wire size is 6AWG 1 Twist two 10 gauge wires approximately 18 long onto each of the...

Страница 44: ...tom lip of the head assembly Remove the tape from the adhesive strip on the back of the sign With the adhesive strip facing toward the pedestal insert the top left corner of the sign under the groove...

Страница 45: ...s slightly 2 Slide the sign all the way down ensuring its bottom edge is located behind the plastic cap on the cord management assembly as shown 3 Re install the top assembly Remember to tighten the s...

Страница 46: ...ucts provided by CHARGEPOINT under each of the Limited Warranty and the Extended Warranty may be re manufactured or reconditioned Products or if the exact Product is no longer manufactured by CHARGEPO...

Страница 47: ...ICULAR PURPOSE EVEN IF CHARGEPOINT OR DISTRIBUTOR HAS BEEN INFORMED OF SUCH PURPOSE OR AGAINST INFRINGEMENT Some states or jurisdictions do not allow the exclusion of express or implied warranties so...

Страница 48: ...the International Sale of Goods shall not apply This Limited Product Warranty is the entire and exclusive agreement between you and CHARGEPOINT with respect to its subject matter and any modification...

Страница 49: ...ion you should review this manual carefully and consult with a licensed contractor licensed electrician and trained installation expert to ensure compliance with local building practices climate condi...

Страница 50: ...254 East Hacienda Avenue Campbell CA 95008 USA US toll free 1 877 850 4562 www chargepoint com Document Part Number 75 001164 01 Rev 3...

Отзывы: