B-1
Prepare Installation Site
B
Before You Start
The CPF25’s pedestal mount can be installed either:
•
into the ground by casting into new concrete
•
onto an existing concrete surface
•
onto a stacked parking platform
The kit components you need to use, the tools required, and the installation steps vary depending on the type of
installation. This appendix provides basic guidelines for these types of installations.
IMPORTANT:
Always check local codes to ensure compliance. You may need to adjust the guidelines provided
in this appendix to comply with codes that apply at your installation location.
Installation Overview
To install the CPF25 pedestal mount into the ground, you
will need the components shown below. These
components are included in the shipping box with the
pedestal and can also be purchased from ChargePoint by
ordering a CPF25 Pedestal Mount Kit.
•
8-32 X 3/8” Screws (4)
•
5/8” - 11 X 9” Grade 55 Bolts (4)
•
5/8” - 11 Hex Nuts (16)
•
5/8” Washers (12)
•
Installation Template 75-001163-01 (stapled into the
center of this Installation Guide)
*
NOTE:
When installing onto an existing concrete
surface, you will need only 6 Galvanized Hex Nuts and 6
Galvanized Washers. But you will need several
consumables as described on page A-3.
184,15
[7.250]
184,15
[7.250]
15,875
0.6250
[
]
225,00
[8.858]
225,00
[8.858]
(92,08
)
[3.625]
(112,50
)
[4.429]
PRINT 1:1 ON 11"X17"
DO NOT SCALE
DIMENSIONS IN MM [INCHES]
Template, Bolt Pattern, CPF25
PN: 75-001163-01, Rev 1
________________________
ChargePoint, Inc.
Campbell, CA
www.chargepoint.com
800-850-4562
Reference Installation
Guide, PN 75-001164-01
Appendix A
RECOMMEND 1-1/4" TRADE SIZE
CONDUIT STUB-UP
1 FT TALL, 6FT SERVICE LOOP