Install Station(s) and Charging Cord(s)
4-5
Step 7: Attach the Charging Cord(s) to the CMK
If your station is equipped with a cord management kit, follow
these steps to connect each charging cord to the nylon rope
that keeps the charging cord in place:
1.
Gently extend the charging cord all the way out and away
from the station. Rotate the plugs as needed to remove any
twist or kinks.
2.
Align the knot bearing on each rope to its corresponding
mating feature on the cable clamp. Turn the knot bearing
clockwise approximately 1/4 turn. You may need to push
down while turning the knot bearing.
NOTE:
If you are installing a single-station CPF25, attach the
charging cord to the LEFT side of the station to minimize interference with the card reader.
The physical installation of the CPF25 is now complete and you are ready to prepare the station for
activation on ChargePoint, as described in the next section.