page 34
www.CentSys.com
FIGURE 29. MARK THE GATE BRACKET HEIGHT
Spirit level
With the operator levelled,
mark the Gate Bracket
height on the gate
9.3.5.1. VERT-X Metal Template
From Figure 18 and Table 6 find
the corresponding C-Value for the
installation determined in Section
9.3.1.
Close the gate leaf and mark the
C-Value distance along the gate leaf
(measured from the Gate Hinge
Point).
Refer to Figure 28 for details.
Mount the operator to the Wall Bracket and, using a spirit level, level the operator and
determine the height of the Gate Bracket. Mark the height of the Gate Bracket.
OPERA
TOR
INS
TALLATION
-
INW
ARD
OPENING
GA
TE
9.3.5. Step 5: Mounting the Gate Bracket
Although the installation is easier when using the
VERT-X
Metal Template (which
can be purchased as an optional extra), it is possible to install the unit without
the use of the template.
FIGURE 28. MARK THE C-VALUE
C
Gate Hinge Point
Gate Hinge
Wall
Bracket
•
The operator should never be run manually directly off of a battery!
Doing so and driving the operator into an endstop will result in serious
damage being sustained by the worm drive
• Never lubricate the worm drive
S
ECTION
9
Содержание VERT-X
Страница 8: ...page 8 www CentSys com This section has been left blank intentionally...
Страница 53: ...page 53 www CentSys com Notes NOTES...
Страница 54: ...page 54 www CentSys com Notes...
Страница 55: ...page 55 www CentSys com NOTES Notes NOTES...