![CE+T Power T2S-ETH Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/ce-t-power/t2s-eth/t2s-eth_user-manual_2577175010.webp)
3.4 Maintenance
•
The modular inverter system/rack can reach hazardous leakage currents. Earthing must be carried out prior to
energizing the system. Earthing shall be made according to local regulations.
•
Prior to any work conducted on a system/unit make sure that AC input voltage and DC input voltage are
disconnected.
•
Inverter modules and shelves contain capacitors for filtering and energy storage. Prior to accessing the system/
modules after power down, wait at least 5 minutes to allow capacitors to discharge.
•
Some components and terminals carry high voltage during operation. Contact may result in fatal injury.
3.5 Replacement and Dismantling
•
ESD Strap must be worn when handling PCBs and open units.
•
CE+T cannot be held responsible for disposal of the Inverter system and therefore the customer must segregate
and dispose of the materials which are potentially harmful to the environment, in accordance with the local
regulations in force in the country of installation.
•
If the equipment is dismantled, to dispose of its component products, you must comply with the local regulations
in force in the country of destination and in any case avoid causing any kind of pollution.
To download the latest documentation and software, please visit our website at
www.cet-power.com
10
– Monitoring T2S - ETH User Manual – v1.4
Warranty and Safety Conditions
Содержание T2S-ETH
Страница 64: ...64 Monitoring T2S ETH User Manual v1 4 SNMP...
Страница 96: ......