7 - MAINTENANCE
7.
Start up the engine.
•
DO NOT crank the engine for more than 30
seconds.
•
If the engine will not start, repeat the bleeding
process.
NOTE:
The engine will start hard the next four or five times.
Generally, the engine will crank for ten seconds the second
time it is started and about five seconds the third time it is
started.
8.
Run the engine for several minutes and then shut
down the engine.
7-93
Содержание 570NXT
Страница 8: ......
Страница 23: ...1 GENERAL INFORMATION Symbol Definition Less than Greater than mg kg Milligrams per kilogram 1 15 ...
Страница 24: ...1 GENERAL INFORMATION 1 16 ...
Страница 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Страница 142: ...6 WORKING OPERATIONS 6 34 ...
Страница 167: ...7 MAINTENANCE Adjust Interval Page no Maintenance action No of pts As required 7 102 Disable parking brake X 7 25 ...
Страница 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Страница 197: ...7 MAINTENANCE 15 Check the fluid level and add if necessary Refer to page 7 41 for the procedure 7 55 ...
Страница 252: ...7 MAINTENANCE 7 110 ...
Страница 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Страница 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Страница 260: ...8 SPECIFICATIONS 8 8 ...
Страница 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Страница 272: ...9 ACCESSORIES 9 4 ...
Страница 279: ......