
6 - WORKING OPERATIONS
Remove an attachment:
1. With the attachment resting on the ground, press and
hold the left emblem
of rocker switch to retract
the coupler lock pins.
2. Raise the attachment a maximum of
25.4 - 50.8 mm
(
1 - 2 in
) off the ground and slowly rotate the top of the
attachment outward until the lock pins are clear of the
attachment mounting bores.
3. Release the rocker switch.
RAPH12UTL0022AA
7
4. Carefully lower the attachment to the ground while ro-
tating the top of the coupler outward.
5. When the upper coupler mounting pins are free, back
away from the attachment.
6-25
Содержание 570NXT
Страница 8: ......
Страница 23: ...1 GENERAL INFORMATION Symbol Definition Less than Greater than mg kg Milligrams per kilogram 1 15 ...
Страница 24: ...1 GENERAL INFORMATION 1 16 ...
Страница 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Страница 142: ...6 WORKING OPERATIONS 6 34 ...
Страница 167: ...7 MAINTENANCE Adjust Interval Page no Maintenance action No of pts As required 7 102 Disable parking brake X 7 25 ...
Страница 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Страница 197: ...7 MAINTENANCE 15 Check the fluid level and add if necessary Refer to page 7 41 for the procedure 7 55 ...
Страница 252: ...7 MAINTENANCE 7 110 ...
Страница 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Страница 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Страница 260: ...8 SPECIFICATIONS 8 8 ...
Страница 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Страница 272: ...9 ACCESSORIES 9 4 ...
Страница 279: ......