7 - MAINTENANCE
3.
Press Enter.
RAPH12UTL0172AA
3
4.
DPF regeneration
WAIT
symbol appears. The sys-
tem is validating machine readiness and all actions
in step
2
have been completed.
RCPH11TLB002AAD
4
5.
One of the following will occur.
•
DPF regeneration
ON
symbol appears indicat-
ing the regeneration process has started, allow
approximately 20 minutes to complete.
RCPH11TLB006AAD
5
•
DPF regeneration
FAIL
symbol appears indi-
cating the machine is not ready. Repeat step
2
.
NOTE:
If the DPF regeneration continues to FAIL contact
your authorized dealer for service.
RCPH11TLB010AAD
6
7-33
Содержание 570NXT
Страница 8: ......
Страница 23: ...1 GENERAL INFORMATION Symbol Definition Less than Greater than mg kg Milligrams per kilogram 1 15 ...
Страница 24: ...1 GENERAL INFORMATION 1 16 ...
Страница 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Страница 142: ...6 WORKING OPERATIONS 6 34 ...
Страница 167: ...7 MAINTENANCE Adjust Interval Page no Maintenance action No of pts As required 7 102 Disable parking brake X 7 25 ...
Страница 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Страница 197: ...7 MAINTENANCE 15 Check the fluid level and add if necessary Refer to page 7 41 for the procedure 7 55 ...
Страница 252: ...7 MAINTENANCE 7 110 ...
Страница 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Страница 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Страница 260: ...8 SPECIFICATIONS 8 8 ...
Страница 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Страница 272: ...9 ACCESSORIES 9 4 ...
Страница 279: ......