
7 - MAINTENANCE
Grease fittings
Clean the fittings before greasing. Grease the pivot points, pins, and fittings with
T
UTELA
M
ULTI
-
PURPOSE
EP
GREASE
251H, GR-9
every 10 hours of operation or each day. If you operate the machine in severe conditions, grease more
often.
Loader
RCPH10TLB065FAM
1
1. Lift arm pivot
4. Bucket cylinder trunnion
2. Lift cylinder
5. Bucket cylinder, rod end
3. Bucket link
6. Bucket pivots
1.
Lift arm pivot - four total, two on each side
RCPH10TLB381AAF
2
7-38
Содержание 570NXT
Страница 8: ......
Страница 23: ...1 GENERAL INFORMATION Symbol Definition Less than Greater than mg kg Milligrams per kilogram 1 15 ...
Страница 24: ...1 GENERAL INFORMATION 1 16 ...
Страница 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Страница 142: ...6 WORKING OPERATIONS 6 34 ...
Страница 167: ...7 MAINTENANCE Adjust Interval Page no Maintenance action No of pts As required 7 102 Disable parking brake X 7 25 ...
Страница 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Страница 197: ...7 MAINTENANCE 15 Check the fluid level and add if necessary Refer to page 7 41 for the procedure 7 55 ...
Страница 252: ...7 MAINTENANCE 7 110 ...
Страница 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Страница 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Страница 260: ...8 SPECIFICATIONS 8 8 ...
Страница 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Страница 272: ...9 ACCESSORIES 9 4 ...
Страница 279: ......